441
Herald; Texas; Aug 14 The U S Army Corps of Engineers has notified two developers of liquefied natural
442
the Davis Mountains overlooked by geologists and engineers who believed it would be a poor fit for hydraulic
443
Corps of Engineers easement on the Skipanon Peninsula in Warrenton came too late Oregon LNG claimed
444
is refined from crude and is the fuel of choice for most of engines in farm and manufacturing equipment
445
and Memphis Community Against Pipeline in petitioning the U S Army Corps of Engineers not to allow
446
Wirth 58 the chemical engineer who became Chevron CEO 15 months ago He has quickly shaken up Chevron
447
Discovery to first LNG will have taken 17 years for Japan’s INPEX Offshore Engineer; Feb 1 In 2000 Japanese
448
of the pipeline And Oregon LNG was embroiled in a lawsuit with the U S Army Corps of Engineers over an easement
449
against the U S Army Corps of Engineers which authorized the 3 7 billion project seeking a preliminary
450
engineer at state owned Myanma Oil and Gas Enterprise Imports could provide a possible short term solution
451
‘banked’ production from previous years ” said Jan Bygdevoll a government senior reservoir engineer http
452
investment decision The company also said it has engineered a small gain in capacity at the plant from 8 4
453
is the result of engineers tinkering with inputs and discovering one of the many little technological
454
analytics firm IHS Markit Nearly 80 of ships that burn LNG use a type of engine that leaks 3 1 of the fuel
455
are starting to picture a world in which China the engine of demand growth comes back to the market
456
gross tonne 420 foot long vessel is planned for a dual fuel engine that can run on LNG or fuel oil
457
to methane from the unburned natural gas in dual fuel engine exhaust https: www msn com en us finance markets
458
Protection and U S Army Corps of Engineers The private port is designed for multiple purposes — to receive
459
engines that use alternative fuels with lower carbon content such as LNG and to use LNG during port stays
460
and losing said the Shell executive The engineer is feeling optimistic about building an LNG export terminal