2
Published November 30, 2001
Contents: '; ..., selected presentations, and subcommittee meeting summaries....
Volume 1 of 2
Volume 2 of 2
5
Published December 1981
Contents: '; ..."This report presents the Technical Support Contractor's (TSC) terrain stability study performed...

Report Number(s): 09-TR-0025 WBS 1.01.09.07

Link to full text
6
7
by Nebesky, William
Published May 9, 2008
Subjects: '; ...Net present value model (NPV)...
Link to full text
8
Published October 1981
Contents: '; ...This report presents a methodology for the estimation of a Pipeline Design Flood for streams...
Link to full text
9
Published May 1977
Contents: '; ...This report presents the results of the laboratory test program for frozen soils from the North...
Link to full text
10
Published October 1, 1982
Contents: '; ... of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline...

Report Number(s): Document no. H-17, Rev. 0

Link to full text
11
Published [1981?]
Contents: '; ..."This report presents the Technical Support Contractor's (TSC) terrain stability study performed...

Report Number(s): 09-TR-0025 WBS 1.01.09.07

Link to full text
12
Published April 2011
Contents: '; ...This report presents location information, facility descriptions, resource impact data...

Report Number(s): USAG-UR-SGREG-000003

Link to this volume
Webpage linking all volumes
13
Published June 30, 1977
Contents: '; ... that are presented in the Federal Power Commission report: Recommendation to the President : Alaska natural gas...
Link to full text
14
Published 27 September 1982
Contents: '; ... north and south of Atigun Pass are presented....

Report Number(s): H08

PDF contains the set of three pieces (letter and two attachments). This report appears as the third document in this PDF file
15
by Bayer, Michael J.
Published January 14, 1992
Contents: '; ... System. It also discusses five main issues and presents recommendations. (It does not cover technical...
Link to full text