1
Published December 1981
Contents: ';
“..."This report presents the Technical Support Contractor's (TSC) terrain stability study performed...”Report Number(s): 09-TR-0025 WBS 1.01.09.07
Link to full text
2
Published October 1, 1982
Contents: ';
“... of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline...”Report Number(s): Document no. H-17, Rev. 0
Link to full text
3
[Evaluation of slope stability procedures, Alaska segment, Alaska Natural Gas Transportation System]
Published [1981?]
Contents: ';
“..."This report presents the Technical Support Contractor's (TSC) terrain stability study performed...”Report Number(s): 09-TR-0025 WBS 1.01.09.07
Link to full text
4
Published 27 September 1982
Contents: ';
“... north and south of Atigun Pass are presented....”Report Number(s): H08
PDF contains the set of three pieces (letter and two attachments). This report appears as the third document in this PDF file
5
by Bayer, Michael J.
Published January 14, 1992
Contents: ';
“... System. It also discusses five main issues and presents recommendations. (It does not cover technical...”Published January 14, 1992
Link to full text