A preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline : report to the Northwest Pipeline Corporation, Salt Lake City, Utah
The corridor described in this report is a proposed route for a natural gas pipeline that departs from the Alaska Highway at Tetlin Junction and passes through Dawson City in order to connect to a future spur line along the Dempster Highway. This report summarizes field reconnaissance conducted Augu...
Saved in:
Alternate Title: | Report to the Northwest Pipeline Corporation, Salt Lake City, Utah, a preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline |
---|---|
Main Author: | |
Corporate Contributor(s): | Northwest Pipeline Corporation |
Document Type: | Report |
Publisher: | Van Hyning, Jack M. |
Date: | August 1977 |
Sponsor / Funder: | Northwest Pipeline Corporation |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
LEADER | 01866cmm a22003013 4500 | ||
---|---|---|---|
001 | 2810285 | ||
003 | SIRSI | ||
008 | 160616s1977 000 0 eng u | ||
100 | 1 | |a Van Hyning, Jack M. | |
245 | 1 | 2 | |a A preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline : report to the Northwest Pipeline Corporation, Salt Lake City, Utah |
246 | 3 | |a Report to the Northwest Pipeline Corporation, Salt Lake City, Utah, a preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline | |
260 | |a Van Hyning, Jack M. | ||
300 | |a 36 p. | ||
380 | |a Report | ||
518 | |a August 1977 | ||
546 | |a English | ||
500 | |a At head of title: Report to the Northwest Pipeline Corporation, Salt Lake City, Utah. | ||
520 | |a The corridor described in this report is a proposed route for a natural gas pipeline that departs from the Alaska Highway at Tetlin Junction and passes through Dawson City in order to connect to a future spur line along the Dempster Highway. This report summarizes field reconnaissance conducted August 3-5, 1977, literature, and interviews with agency personnel in order to define possible environmental problems that may require detailed study for such a project. | ||
505 | 0 | |a Introduction -- Description of the environment. General topography, climate and vegetation. Population and economy. The Fortymile River. Fish. Wildlife -- Log of the Taylor Highway -- Summary and conclusions. | |
653 | |a Environmental analysis | ||
653 | |a Corridors | ||
651 | 0 | |a Taylor Highway | |
651 | |a Fortymile River | ||
690 | |a PF-ENVI | ||
710 | 2 | |a Northwest Pipeline Corporation | |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report4/Report_VanHyning_1977_PreliminaryEnvironmentalAssessment.pdf |
901 | |a ARLIS |c orig 201606 | ||
596 | |a 10 |