A preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline : report to the Northwest Pipeline Corporation, Salt Lake City, Utah

The corridor described in this report is a proposed route for a natural gas pipeline that departs from the Alaska Highway at Tetlin Junction and passes through Dawson City in order to connect to a future spur line along the Dempster Highway. This report summarizes field reconnaissance conducted Augu...

Full description

Saved in:
Bibliographic Details
Alternate Title:Report to the Northwest Pipeline Corporation, Salt Lake City, Utah, a preliminary environmental assessment of the Taylor Highway, Alaska, with reference to a natural gas pipeline
Main Author: Van Hyning, Jack M.
Corporate Contributor(s):Northwest Pipeline Corporation
Document Type: Report
Publisher:Van Hyning, Jack M.
Date:August 1977
Sponsor / Funder:Northwest Pipeline Corporation
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
Description
Summary:The corridor described in this report is a proposed route for a natural gas pipeline that departs from the Alaska Highway at Tetlin Junction and passes through Dawson City in order to connect to a future spur line along the Dempster Highway. This report summarizes field reconnaissance conducted August 3-5, 1977, literature, and interviews with agency personnel in order to define possible environmental problems that may require detailed study for such a project.
Physical Description:36 p.
Notes:At head of title: Report to the Northwest Pipeline Corporation, Salt Lake City, Utah.