Compatibility evaluation of the proposed Trans-Alaska Gas System with foreign pipelines

This report was prepared to determine whether the Trans-Alaska Gas System (TAGS) is compatible with other pipelines, such as Trans-Alaska Pipeline System and the Alaska Natural Gas Transportation System. Compatibility implies that construction, operation, and maintenance of TAGS will not interrupt o...

Full description

Saved in:
Bibliographic Details
Corporate Author(s): Bureau of Land Management. Alaska State Office (BLM-Alaska), Alaskan Northwest Natural Gas Transportation Company (ANNGTC)
Document Type: Governmental finding Legal
Publisher:Bureau of Land Management. Alaska State Office (BLM-Alaska)
Report Numbers:D-0025369

Docket no. CP80-
Date:January 1987
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 03244cmm a22004093a 4500
001 2376094
003 SIRSI
005 20150217021252.0
008 150212s1987 akua f000 0 eng d
088 |a D-0025369 
088 |a Docket no. CP80- 
110 1 |a Bureau of Land Management. Alaska State Office (BLM-Alaska) 
110 1 |a Alaskan Northwest Natural Gas Transportation Company (ANNGTC) 
245 1 0 |a Compatibility evaluation of the proposed Trans-Alaska Gas System with foreign pipelines 
260 |a Bureau of Land Management. Alaska State Office (BLM-Alaska) 
300 |a 50 p. 
380 |a Governmental finding 
380 |a Legal 
518 |a January 1987 
546 |a English 
500 |a Includes letter of transmittal. Title page is page 2. 
500 |a Cataloging based on copy that had been distributed as Appendix B to another report. 
500 |a Prepared by the Compatibility Review Team established by Bureau of Land Management, Alaska State Office. 
520 |a This report was prepared to determine whether the Trans-Alaska Gas System (TAGS) is compatible with other pipelines, such as Trans-Alaska Pipeline System and the Alaska Natural Gas Transportation System. Compatibility implies that construction, operation, and maintenance of TAGS will not interrupt or impair the operation and maintenance of these other pipelines in an unreasonable manner. The report is in response to Yukon Pacific Corporation's filing on December 5, 1986 for an amended right-of-way application for the construction of a pipeline from Prudhoe Bay to Port Valdez. 
505 0 |a Compatibility evaluation -- [Letter to Jules V. Tileston from Theodore J. Garrish, July 9, 1987]. "D-0025369." -- [List of Compatibility Review Team members] -- Chronology of Compatibility Review Team activities -- United States of America before the Federal Energy Regulatory Commission, Application of Alaskan Northwest Natural Gas Transportation Company for a final certificate of public convenience and necessity authorizing the construction and operation of the Alaska segment of the Alaska Natural Gas Transportation System. Docket no. CP80-. July 1, 1980 -- References used -- Yukon Pacific Corporation's responses to the four compatibility issues addressed on pages 2 and 3 of the compatibility evaluation -- ANGTS sales gas conditioning facility. 
653 |a Pipelines 
653 |a Government policy 
653 |a Applications 
610 2 0 |a Trans-Alaska Gas System (TAGS) 
610 2 0 |a Yukon Pacific Corporation 
610 2 0 |a Alaska Natural Gas Transportation System (ANGTS) 
610 |a Alaskan Northwest Natural Gas Transportation Company (ANNGTC) 
651 |a Prudhoe Bay to Valdez route 
740 0 2 |a [Letter to Jules V. Tileston from Theodore J. Garrish, July 9, 1987] 
740 0 2 |a United States of America before the Federal Energy Regulatory Commission, Application of Alaskan Northwest Natural Gas Transportation Company for a final certificate of public convenience and necessity authorizing the construction and operation of the Alaska segment of the Alaska Natural Gas Transportation System 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Gov/Gov_BLM_1987_CompatibilityEvaluationOfTAGS.pdf 
596 |a 10