Flood frequency determinations

Floods of particular frequency or return period are required for design of structures along the pipeline corridor of the Alaska Natural Gas Transportation System.

Saved in:
Bibliographic Details
Alternate Title:Flood frequency determinations. Revision 6 (1982)
Corporate Author: Northwest Alaskan Pipeline Company
Document Type: Report
Publisher:Northwest Alaskan Pipeline Company
Report Numbers:H-12
Date:September 1982
Addressee / Recipient:Black, William
Edition:Revision 6
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 03050cmm a22004213 4500
001 2355573
003 SIRSI
008 121010n1982 000 0 eng u
088 |a H-12 
110 1 |a Northwest Alaskan Pipeline Company 
245 0 |a Flood frequency determinations 
246 |a Flood frequency determinations. Revision 6 (1982) 
250 |a Revision 6 
260 |a Northwest Alaskan Pipeline Company 
518 |a September 1982 
300 |a 57 p. 
380 |a Report 
546 |a English 
500 |a Title page is lacking. Title, issuing agency, date, and revision information are from the technical data sheet. 
500 |a This report is an enclosure to a letter to William Black (Director of Engineering, Office of the Federal Inspector) from Edwin (Al) Kuhn (Director, Governmental Affairs, Northwest Alaskan Pipeline Company) dated September 29, 1982. That letter is called "Hydrology matters; submission of final technical reports." In addition to that cover letter, a petition called "Petition for "Business" designation submitted to OFI pursuant to 10 CFR Part 1504 : enclosure to Northwest Alaskan Pipeline Company letter GOA-82-1119, September 29, 1982 to Mr. William Black" accompanied the distribution of this report. All three pieces of this set of correspondence are cataloged separately. 
500 |a According to the cover letter, this report is copyrighted, confidential, and proprietary, and remains property of the Alaskan Northwest Natural Gas Transportation Company. 
500 |a The technical data sheet indicates this is revision 6 or "issued for review". 
500 |a The document number "H-12" is handwritten on the technical data sheet. 
520 |a Floods of particular frequency or return period are required for design of structures along the pipeline corridor of the Alaska Natural Gas Transportation System. 
505 0 |a Introduction, purpose, and scope of study -- Data available -- Statistical analysis -- Prediction for small drainage areas -- Equations for prediction -- Method for application -- References -- [Tables and figures]. 
653 |a Flood 
653 |a Hydrology 
653 |a Fish streams 
610 |a Alaska Natural Gas Transportation System (ANGTS) 
690 |a PF-ENVI 
700 |a Black, William 
740 0 |a Petition for "Business" designation submitted to OFI pursuant to 10 CFR Part 1504 : enclosure to Northwest Alaskan Pipeline Company letter GOA-82-1119, September 29, 1982 to Mr. William Black 
740 0 |a Hydrology matters; submission of final technical reports 
740 0 |a Pipeline design flood. Revision 4 (1982) 
740 0 |a Hydrograph reconstitutions. Revision 3 (1982) 
740 0 |a Scour and bank migration. Revision 3 (1982) 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report2/Report_NAPC_1982_Hydrology.pdf  |y PDF contains the set of three pieces (letter and two attachments). This report appears as the third document in this PDF file. Three of the original enclosures (all related reports) are missing 
596 |a 10