Cost estimate dramatically reduced on major pipeline project to serve U.S.
Estimated costs of the Alaska Natural Gas Transportation System have been revised down due to reassessment of the project design.
Saved in:
Alternate Title: | New transportation economics for Alaskan gas |
---|---|
Main Author: | |
Corporate Author: | |
Document Type: | Press release |
Publisher: | Northwest Alaskan Pipeline Company |
Date: | June 06, [1988] |
Subjects: | |
Online Access: | View Full Text |
Library Holdings: | Print Versions |
Summary: | Estimated costs of the Alaska Natural Gas Transportation System have been revised down due to reassessment of the project design. |
---|---|
Physical Description: | 2 p. |
Notes: | Caption title. Top of page 1 is cut-off in the digital file which originally showed name of the company. Accompanied by a cover letter to Theodore J. Garrish, Federal Inspector for ANGTS, from Cuba Wadlington, Jr., Vice-President of Regulatory Affairs (of the Northwest Alaskan Pipeline Company) dated June 6, 1988, and by a brochure titled "Alaska Natural Gas Transportation System, new transportation economics for Alaskan gas." This item is archived in Box 1, File 1.l of the document collection for Office of the Federal Inspector for the Alaska Natural Gas Transportation System, housed at National Archives and Records Administration, Washington, D.C. |