Alaska natural gas transportation systems : White House Task Force, lead agency report on construction delay and cost overrun

Saved in:
Bibliographic Details
Alternate Title:White House Task Force, lead agency report on construction delay and cost overrun

Alaska natural gas transportation systems : White House Task Force, lead agency report on construction delay and cost overruns
Corporate Author(s): U.S. Department of the Interior (DOI), U.S. Department of Transportation (USDOT)
Document Type: Report
Publisher:U.S. Department of the Interior (DOI)

U.S. Department of Transportation (USDOT)
Date:July 1, 1977
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 01504cmm a22003733 4500
001 1495234
003 SIRSI
008 130415n1977 000 0 eng u
110 1 |a U.S. Department of the Interior (DOI) 
110 1 |a U.S. Department of Transportation (USDOT) 
245 0 0 |a Alaska natural gas transportation systems : White House Task Force, lead agency report on construction delay and cost overrun 
246 3 0 |a White House Task Force, lead agency report on construction delay and cost overrun 
246 1 |a Alaska natural gas transportation systems : White House Task Force, lead agency report on construction delay and cost overruns 
260 |a U.S. Department of the Interior (DOI) 
260 |a U.S. Department of Transportation (USDOT) 
518 |a July 1, 1977 
300 |a 136 p. 
380 |a Report 
546 |a English 
500 |a Subtitle on cover: White House Task Force, lead agency report on construction delay and cost overruns 
653 |a Design and construction 
653 |a Costs 
653 |a Project analysis 
653 |a Government roles 
653 |a Transport 
653 |a Natives--Canada 
610 |a Federal Power Commission (FPC) 
610 |a First Nations (Canada) 
690 |a PF-CONS 
690 |a PF-ECON 
690 |a PF-CANGOV 
740 0 |a Recommendation to the President : Alaska natural gas transportation systems 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report3/Report_DOI_1977_WhiteHouseTaskForce.pdf 
596 |a 10