Alaska Pipeline Project preliminary draft resource report 1. Appendix 1F, Table summarizing distances to borrow sites
This appendix contains Table 1F-1, which lists borrow sites for the proposed Alaska mainline and Point Thomson gas transmission pipeline routes, and gives their sizes in acres. The distances to borrow sites are not provided, as they are to be determined.
Saved in:
Alternate Title: | Appendix 1F, Table summarizing distances to borrow sites Table summarizing distances to borrow sites Alaska Pipeline Project, distances to borrow sites |
---|---|
Corporate Author(s): | , , , |
Corporate Contributor(s): | Federal Energy Regulatory Commission (FERC) |
Document Type: | Data |
Publisher: | Alaska Pipeline Project (APP) |
Report Numbers: | USAG-UR-SGREG-000002 |
Date: | April 2011 |
Sponsor / Funder: | Federal Energy Regulatory Commission (FERC) |
Edition: | Draft |
Subjects: | |
Online Access: | View Full Text View Full Text |
Library Holdings: | Print Versions |
LEADER | 01772cmm a22004213 4500 | ||
---|---|---|---|
001 | 1475912 | ||
003 | SIRSI | ||
008 | 120815n2011 000 0 eng u | ||
088 | |a USAG-UR-SGREG-000002 | ||
110 | |a Alaska Pipeline Project (APP) | ||
110 | 1 | |a ExxonMobil | |
110 | 1 | |a TransCanada | |
110 | 1 | |a Foothills Pipe Lines Ltd. | |
245 | 1 | 0 | |a Alaska Pipeline Project preliminary draft resource report 1. Appendix 1F, Table summarizing distances to borrow sites |
246 | |a Appendix 1F, Table summarizing distances to borrow sites | ||
246 | |a Table summarizing distances to borrow sites | ||
246 | |a Alaska Pipeline Project, distances to borrow sites | ||
250 | |a Draft | ||
260 | |a Alaska Pipeline Project (APP) | ||
300 | |a 5 p. | ||
380 | |a Data | ||
546 | |a English | ||
518 | |a April 2011 | ||
500 | |a Title in table caption: Table 1F-1. Alaska Pipeline Project, distances to borrow sites | ||
520 | |a This appendix contains Table 1F-1, which lists borrow sites for the proposed Alaska mainline and Point Thomson gas transmission pipeline routes, and gives their sizes in acres. The distances to borrow sites are not provided, as they are to be determined. | ||
653 | |a Project description | ||
653 | |a Borrow sites | ||
653 | |a Dredging | ||
653 | |a Sealift | ||
653 | |a Carbon dioxide | ||
653 | |a Eagles | ||
610 | |a Alaska Pipeline Project (APP) | ||
690 | |a PF-PROJ | ||
690 | |a PF-CONS | ||
710 | |a Federal Energy Regulatory Commission (FERC) | ||
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_RRPD/PrelimDraftResourceReport1F.pdf |y Link to this volume |
856 | 4 | 0 | |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_RRPD/index.html |y Webpage linking all volumes |
596 | |a 10 |