Alaska Pipeline Project resource report no. ... preliminary draft

Saved in:
Bibliographic Details
Alternate Title:Alaska Pipeline Project preliminary draft resource report 1
Corporate Author(s): Alaska Pipeline Project (APP), ExxonMobil, TransCanada, Foothills Pipe Lines Ltd.
Corporate Contributor(s):Federal Energy Regulatory Commission (FERC)
Document Type: Report Map
Publisher:Alaska Pipeline Project
Report Numbers:USAG-UR-SGREG-000002 (Report no. 1)

USAG-UR-SGREG-000003 (Report no. 10)
Date:April 2011
Sponsor / Funder:Federal Energy Regulatory Commission (FERC)
Subjects:
Online Access:View Full Text
View Full Text
Library Holdings:Print Versions
LEADER 02606cmm a22003853 4500
001 1475794
003 SIRSI
008 120815n2011 000 0 eng u
110 1 |a Alaska Pipeline Project (APP) 
088 |a USAG-UR-SGREG-000002 (Report no. 1) 
088 |a USAG-UR-SGREG-000003 (Report no. 10) 
245 0 0 |a Alaska Pipeline Project resource report no. ... preliminary draft 
246 |a Alaska Pipeline Project preliminary draft resource report 1 
260 |a Alaska Pipeline Project 
300 |a 15 vols. 
546 |a English 
518 |a April 2011 
380 |a Report 
380 |a Map 
500 |a Title in page header: Alaska Pipeline Project preliminary draft resource report 1. 
500 |a Each report and each appendix is cataloged separately. 
500 |a Appendices 1B, 1D, 1H, 1I, 1J, 1K, 1L, and 10A contain no information. Their contents are to be released in the draft report. 
500 |a "APP has prepared this resource report in support of its application to the U.S. Federal Energy Regulatory Commission (FERC) for a Certificate of Public Convenience and Necessity"--Main report, p. 101. 
505 0 |a Main report 1 -- Appendix 1A. U.S. Geological Survey topographic-based corridor maps -- Appendix 1B. Aboveground facility location maps and typical plot plans -- Appendix 1C. Highway and pipeline proximity tables -- Appendix 1D. Table of additional temporary workspace by milepost -- Appendix 1E, Typical drawings -- Appendix 1F. Table summarizing distances to borrow sites -- Appendix 1G. Rationale for the width of the construction right-of-way -- Appendix 1H. Table of construction rights-of-way by milepost -- Appendix 1I. Alaska Pipeline Project's upland erosion control, revegetation, and maintenance plan -- Appendix 1J. Alaska Pipeline Project's wetland and waterbody construction and mitigation procedures -- Appendix 1K. Agency correspondence -- Appendix 1L. Affected landowner names and addresses -- Main report 10 -- Appendix 10A. Route maps comparing route variations to the proposed route. 
610 |a Alaska Pipeline Project (APP) 
653 |a Project description 
110 |a ExxonMobil 
110 |a TransCanada 
110 |a Foothills Pipe Lines Ltd. 
710 |a Federal Energy Regulatory Commission (FERC) 
690 |a PF-PROJ 
690 |a PF-CONS 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_RRPD/PrelimDraftResourceReport1.pdf  |y Link to report No. 1 
856 4 0 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_APP_2011_RRPD/index.html  |y Webpage linking all volumes 
596 |a 10