Gas pipeline on the Yukon River bridge response to technical concerns

The results this preliminary assessment are from the investigation of the feasibility study of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline Company in a joint meeting with representatives from the State of Alaska, the Office of the Fe...

Full description

Saved in:
Bibliographic Details
Corporate Author: Northwest Alaskan Pipeline Company
Document Type: Report
Publisher:Northwest Alaskan Pipeline Company
Report Numbers:Document no. H-17, Rev. 0
Date:October 1, 1982
Series:Alaska Segment : Alaska Natural Gas Transportation System
Subjects:
Online Access:View Full Text
Library Holdings:Print Versions
LEADER 01381cmm a22003133 4500
001 1470360
003 SIRSI
008 121010n1982 000 0 eng u
088 |a Document no. H-17, Rev. 0 
110 1 |a Northwest Alaskan Pipeline Company 
245 1 0 |a Gas pipeline on the Yukon River bridge response to technical concerns 
260 |a Northwest Alaskan Pipeline Company 
518 |a October 1, 1982 
300 |a 171 p. 
380 |a Report 
490 |a Alaska Segment : Alaska Natural Gas Transportation System 
546 |a English 
500 |a Northwest Alaskan Pipeline Company is referenced as NWA in this report 
520 |a The results this preliminary assessment are from the investigation of the feasibility study of the placement of a 48 inch diameter gas line on the bridge, which were presented by Northwest Alaskan Pipeline Company in a joint meeting with representatives from the State of Alaska, the Office of the Federal Inspector and Alyeska Pipeline Service Company. 
653 |a Design and construction 
653 |a Engineering 
653 |a Feasibility 
653 |a Routing 
610 |a Alaska Natural Gas Transportation System (ANGTS) 
651 |a Yukon River Bridge 
690 |a PF-PROJ 
690 |a PF-CONS 
856 |u https://www.arlis.org/docs/vol1/AlaskaGas/Report/Report_NAPC_1982_GasPipelineYukonRiverBridge.pdf 
596 |a 10