2
Published 1981.
...Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10. Phase 1, Final draft report...

Report Number(s): APA 318 RTS 9 SUS 77

Direct link to this document (the main report).
Link to all volumes related to this report.
3
Published [1981?]
...Subtask 7.10. Phase 1, Final draft report. Resident fish investigation on the lower Susitna River....

Report Number(s): APA 318 app. EA RTS 9 app. EA

Direct link to this document (Appendix EA).
Link to all volumes related to this report.
4
Published [1981?]
...Subtask 7.10. Phase 1, Final draft report. Resident fish investigation on the lower Susitna River....

Report Number(s): APA 318 app. EB RTS 9 app. EB

Direct link to this document (Appendix EB).
Link to all volumes related to this report.