1
Published [1979]
Contents: ';
“... of intertie route -- Transmission line design -- System expansion plans -- Facility cost estimates -- Economic...”Report Number(s): APA 146 APA 3205
Link to full text
2
Published [1979]
Contents: ';
“... of intertie route -- Transmission line design -- System expansion plans -- Facility cost estimates -- Economic...”Report Number(s): APA 146 (draft) APA 3205 (draft)
Link to full text
3
Published [1982]
Contents: ';
“... not showing promise for application to the Railbelt region -- Fuel availability and prices -- Cost estimating...”Report Number(s): APA 567 SUS 93
Link to full text
4
5
Published [1981]
Contents: ';
“... in the Railbelt region -- Cooling water systems in steam cycle plants -- Fuel availability and prices -- Aesthetic...”Report Number(s): APA 567 (draft)
Link to full text
6
Published [1985]
“...Susitna Hydroelectric Project. Definition and costs of thermal power alternatives to Susitna...”Report Number(s): APA 2920 SUS 585
Link to full text
7
8
Published [1982]
“...Economic analysis package : meeting January 14 and 15, 1982, Bellevue, Washington...”Report Number(s): APA 2346
Link to full text
9
10
Published 1983.
Report Number(s): APA 148 APA 149
Direct link to the first volume (Sections 1-10).List of volumes.
11
Published [1983]
Report Number(s): APA 315 APA 501 APA 502 APA 503
Direct link to Volume 1 (Sections 1-10 ; Appendixes to sections 4.0 & 8.0).List of all volumes.
12