Report Number(s): APA 1293
Direct link to the review and testimonies.Link to the feasability report (final draft) and list of all documents related to it.
Report Number(s): APA 1395 APA 1396
Direct link to the first volume (Sections A1-A5.7).List of all volumes.
Report Number(s): SuWa 76
Direct link to the first part (Sections 1-5).Webpage for this document and the appendices.
Report Number(s): SuWa 147
Direct link to this study request.Link to related AEA-prepared Integrated Licensing Process study requests.
Report Number(s): SuWa 153
Direct link to this study request.Link to related AEA-prepared Integrated Licensing Process study requests.
Report Number(s): SuWa 148
Direct link to this study request.Link to related AEA-prepared Integrated Licensing Process study requests.
Report Number(s): SuWa 160
Direct link to this study request.Link to related AEA-prepared Integrated Licensing Process study requests.
Report Number(s): APA 3127 APA 3128 APA 3129 APA 3130 APA 3268 SUS 321 SUS 322 SUS 323 SUS 324 SUS 325
Direct link to first available issue (November 1980).List of issues.
Report Number(s): APA 95 APA 169 APA 174 APA 175 APA 176 APA 177 APA 178 APA 179 APA 180 APA 181 APA 182 APA 1414 APA 1415 APA 1416 APA 1417 APA 1418 APA 1419 APA 1420 APA 1421 APA 1422 SUS 38
Direct link to the first volume (Sections 1-8. Engineering and economic aspects).List of all volumes of this feasibility report and a list of related documents.