Task 6, Development selection. Subtask 6.05, Development selection report /
"Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Re...
Saved in:
LEADER | 04544cam a2200805Ia 4500 | ||
---|---|---|---|
001 | 377674 | ||
003 | SIRSI | ||
005 | 20161123121351.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 030806s1981 akuabd bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCF |d OCLCQ |d RLA |d UAB |d RLA | ||
019 | |a 41680523 |a 70525413 | ||
035 | |a (OCoLC)52804827 |z (OCoLC)41680523 |z (OCoLC)70525413 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 220 | |
088 | |a APA 220 | ||
088 | |a APA 356 | ||
088 | |a APA 1435 | ||
088 | |a SUS 43 (v. 1) | ||
245 | 0 | 0 | |a Task 6, Development selection. |n Subtask 6.05, |p Development selection report / |c [prepared by] Acres American Incorporated. |
246 | 3 | 0 | |a Subtask 6.05, |p Development selection report |
246 | 3 | 0 | |a Development selection report |
246 | 3 | |a Susitna Hydroelectric Project, Task 6, Development selection. |n Subtask 6.05, |p Development selection report | |
246 | 1 | 4 | |a Development selection report. |n Task 6, |p Design development |
246 | 3 | |a Task 6, |p Design development | |
246 | 3 | |a Susitna Hydroelectric Project, development selection report. |n Task 6, |p Design development | |
246 | 1 | 6 | |a Alaska Power Authority, Susitna Hydroelectric Project, Susitna Basin development selection. |n Volume I, |p Main report |
246 | 1 | 6 | |a Susitna Basin development selection. |n Volume I, |p Main report |
250 | |a [Final]. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1981] | ||
300 | |a 259 pages in various pagings : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
513 | |a Final report. | ||
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a At head of cover title: Susitna Hydroelectric Project. | ||
500 | |a "December 1981." | ||
510 | 3 | |a Assigned APA Document no. 220 in Susitna Hydroelectric Project document index. Also assigned APA 356 and 1435 (duplicate entries). | |
510 | 3 | |a This document represents volume 1 of the report numbered SUS 43 in the Susitna Aquatic Impact Assessment Project bibliography. The appendix represents the second part of SUS 43. | |
530 | |a Available also in microfiche and electronic format on the Internet. | ||
520 | |a "Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development."--Page 1-1. | ||
504 | |a Includes bibliographical references. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Planning. | |
650 | 0 | |a Energy development |z Alaska |z Susitna River Valley |x Planning. | |
650 | 0 | |a Electric power consumption |z Alaska |x Forecasting. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Electric power consumption |x Forecasting. |2 fast |0 (OCoLC)fst00905405 | |
650 | 7 | |a Energy development |x Planning. |2 fast |0 (OCoLC)fst00910061 | |
650 | 7 | |a Hydroelectric power plants |x Planning. |2 fast |0 (OCoLC)fst00964961 | |
650 | 7 | |a Planning. |2 fast |0 (OCoLC)fst01065224 | |
651 | 7 | |a Alaska. |2 fast |0 (OCoLC)fst01204480 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
651 | 7 | |a Alaska |z Susitna River Valley. |2 fast |0 (OCoLC)fst01273501 | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
770 | 0 | |t Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J. |b [December 1981 edition]. |d [Alaska] : Alaska Power Authority, [1981] |w (OCoLC)52804817 | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 220. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 356. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1435. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/2/APA220.pdf |3 Direct link to this volume. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna/2/APA220.html |3 Link to all volumes. |z ARLIS Document Server |
098 | |a APA 00220 | ||
098 | |a APA 00356 | ||
098 | |a APA 01435 | ||
098 | |a SUS 00043 (v. 1) | ||
596 | |a 9 10 |