Task 6, Development selection. Subtask 6.05, Development selection report /

"Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Re...

Full description

Saved in:
Bibliographic Details
Alternate Title:Subtask 6.05, Development selection report

Development selection report

Susitna Hydroelectric Project, Task 6, Development selection. Subtask 6.05, Development selection report

Development selection report. Task 6, Design development

Task 6, Design development

Susitna Hydroelectric Project, development selection report. Task 6, Design development

Alaska Power Authority, Susitna Hydroelectric Project, Susitna Basin development selection. Volume I, Main report

Susitna Basin development selection. Volume I, Main report
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 220

APA 356

APA 1435

SUS 43 (v. 1)
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 220.
Document (Susitna Hydroelectric Project) ; no. 356.
Document (Susitna Hydroelectric Project) ; no. 1435.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04544cam a2200805Ia 4500
001 377674
003 SIRSI
005 20161123121351.0
007 ta
007 cr bn||a||||||
008 030806s1981 akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA  |d OCLCF  |d OCLCQ  |d RLA  |d UAB  |d RLA 
019 |a 41680523  |a 70525413 
035 |a (OCoLC)52804827  |z (OCoLC)41680523  |z (OCoLC)70525413 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 220 
088 |a APA 220 
088 |a APA 356 
088 |a APA 1435 
088 |a SUS 43 (v. 1) 
245 0 0 |a Task 6, Development selection.  |n Subtask 6.05,  |p Development selection report /  |c [prepared by] Acres American Incorporated. 
246 3 0 |a Subtask 6.05,  |p Development selection report 
246 3 0 |a Development selection report 
246 3 |a Susitna Hydroelectric Project, Task 6, Development selection.  |n Subtask 6.05,  |p Development selection report 
246 1 4 |a Development selection report.  |n Task 6,  |p Design development 
246 3 |a Task 6,  |p Design development 
246 3 |a Susitna Hydroelectric Project, development selection report.  |n Task 6,  |p Design development 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project, Susitna Basin development selection.  |n Volume I,  |p Main report 
246 1 6 |a Susitna Basin development selection.  |n Volume I,  |p Main report 
250 |a [Final]. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1981] 
300 |a 259 pages in various pagings :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
513 |a Final report. 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a At head of cover title: Susitna Hydroelectric Project. 
500 |a "December 1981." 
510 3 |a Assigned APA Document no. 220 in Susitna Hydroelectric Project document index. Also assigned APA 356 and 1435 (duplicate entries). 
510 3 |a This document represents volume 1 of the report numbered SUS 43 in the Susitna Aquatic Impact Assessment Project bibliography. The appendix represents the second part of SUS 43. 
530 |a Available also in microfiche and electronic format on the Internet. 
520 |a "Studies through March 1981 have mainly been concerned with evaluation of the need for electric power in the Alaska Railbelt Regions and consideration of the alternatives for meeting these power needs both with and without a Susitna Basin hydroelectric development. This Development Selection Report presents the results of this initial step in the POS process, and provides recommendations and justification for continuation of study of a specific basin development."--Page 1-1. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Energy development  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Electric power consumption  |z Alaska  |x Forecasting. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Electric power consumption  |x Forecasting.  |2 fast  |0 (OCoLC)fst00905405 
650 7 |a Energy development  |x Planning.  |2 fast  |0 (OCoLC)fst00910061 
650 7 |a Hydroelectric power plants  |x Planning.  |2 fast  |0 (OCoLC)fst00964961 
650 7 |a Planning.  |2 fast  |0 (OCoLC)fst01065224 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
651 7 |a Alaska  |z Susitna River Valley.  |2 fast  |0 (OCoLC)fst01273501 
710 2 |a Alaska Power Authority. 
710 2 |a Acres American Incorporated. 
710 2 |a Susitna Hydroelectric Project. 
770 0 |t Task 6, Development selection. Subtask 6.05, Development selection report. Appendices A through J.  |b [December 1981 edition].  |d [Alaska] : Alaska Power Authority, [1981]  |w (OCoLC)52804817 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 220. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 356. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1435. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/2/APA220.pdf  |3 Direct link to this volume.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna/2/APA220.html  |3 Link to all volumes.  |z ARLIS Document Server 
098 |a APA 00220 
098 |a APA 00356 
098 |a APA 01435 
098 |a SUS 00043 (v. 1) 
596 |a 9 10