Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement /
"The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plan...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access planning study. Supplement Alaska Power Authority, Susitna Hydroelectric Project. Access planning study. Supplement Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement Surveys and site facilities. Subtask 2.10, Access planning study. Supplement Subtask 2.10, Access planning study. Supplement Access planning study. Supplement |
---|---|
Corporate Contributor(s): | Acres American Incorporated. R & M Consultants. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 9 APA 1590 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 9. Document (Susitna Hydroelectric Project) ; no. 1590. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03543cam a2200613Ia 4500 | ||
---|---|---|---|
001 | 375343 | ||
003 | SIRSI | ||
005 | 20120322093248.0 | ||
007 | cr bn||||a|||| | ||
008 | 030710s1982 akub t s000 0 eng d | ||
035 | |a (OCoLC)52589891 | ||
040 | |a RLA |c RLA |d OCLCQ |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 9 | ||
088 | |a APA 1590 | ||
090 | |a TK1425.S8 |b A23 no. 9 | ||
245 | 0 | 0 | |a Task 2, Surveys and site facilities. |n Subtask 2.10, |p Access planning study. |p Supplement / |c prepared for Acres American Incorporated ; prepared by R & M Consultants, Inc. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Access planning study. |p Supplement |
246 | 1 | 6 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Access planning study. |p Supplement |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 2, |p Surveys and site facilities. |n Subtask 2.10, |p Access planning study. |p Supplement | |
246 | 3 | 0 | |a Surveys and site facilities. |n Subtask 2.10, |p Access planning study. |p Supplement |
246 | 3 | 0 | |a Subtask 2.10, |p Access planning study. |p Supplement |
246 | 3 | 0 | |a Access planning study. |p Supplement |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 174 leaves in various foliations (some folded) : |b maps ; |c 28 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a computer |2 rdamedia | ||
338 | |a online resource |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 9, 1590] | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
530 | |a Available also in electronic format on the Internet. | ||
500 | |a This work supplements a report that has been assigned document no. 3 in Susitna Hydroelectric Project document index. | ||
500 | |a "September 1982." | ||
510 | 3 | |a Assigned APA document no. 9 in Susitna Hydroelectric Project document index. Also assigned no. 1590 (duplicate entry). | |
520 | |a "The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plans (appendix F); 5) Plan eleven has been revised to include a low level crossing at Devil Canyon for access to the camp on the south side."--Leaf ii. | ||
505 | 0 | |a Introduction -- Summary -- Scope of work -- Previous studies -- Project design -- Project schedule -- Logistics requirements -- Access route design parameters -- Corridor selection -- Access plan -- Conclusions & recommendations -- Appendices. | |
650 | 0 | |a Transportation |z Alaska |z Susitna River Valley |x Planning. | |
650 | 0 | |a Route surveying |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Roads |z Alaska |z Susitna River Valley |x Design and construction. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River Valley |x Design and construction. | |
650 | 4 | |a Access roads |z Alaska |z Susitna River Valley. | |
650 | 0 | |a Dams |x Access roads |z Alaska |z Susitna River Valley. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a R & M Consultants. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 9. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1590. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA9.pdf |z ARLIS Document Server |
901 | |a 3755 | ||
596 | |a 9 10 | ||
098 | |a APA 00009 | ||
098 | |a APA 01590 |