Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement /

"The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plan...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Access planning study. Supplement

Alaska Power Authority, Susitna Hydroelectric Project. Access planning study. Supplement

Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement

Surveys and site facilities. Subtask 2.10, Access planning study. Supplement

Subtask 2.10, Access planning study. Supplement

Access planning study. Supplement
Corporate Contributor(s):Acres American Incorporated.

R & M Consultants.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 9

APA 1590
Series:Document (Susitna Hydroelectric Project) ; no. 9.
Document (Susitna Hydroelectric Project) ; no. 1590.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plans (appendix F); 5) Plan eleven has been revised to include a low level crossing at Devil Canyon for access to the camp on the south side."--Leaf ii.
Physical Description:174 leaves in various foliations (some folded) : maps ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

This work supplements a report that has been assigned document no. 3 in Susitna Hydroelectric Project document index.

"September 1982."