Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement /
"The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plan...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Access planning study. Supplement Alaska Power Authority, Susitna Hydroelectric Project. Access planning study. Supplement Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study. Supplement Surveys and site facilities. Subtask 2.10, Access planning study. Supplement Subtask 2.10, Access planning study. Supplement Access planning study. Supplement |
---|---|
Corporate Contributor(s): | Acres American Incorporated. R & M Consultants. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 9 APA 1590 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 9. Document (Susitna Hydroelectric Project) ; no. 1590. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "The major items found in this supplement are: 1) Additional segments needed for new plans discussed (chapter nine); 2) New plans discussed (chapter ten); 3) Segment, terrain unit, and environmental concerns maps in appendices updated to show new routes; 4) Cost estimates generated for new plans (appendix F); 5) Plan eleven has been revised to include a low level crossing at Devil Canyon for access to the camp on the south side."--Leaf ii. |
---|---|
Physical Description: | 174 leaves in various foliations (some folded) : maps ; 28 cm. |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. This work supplements a report that has been assigned document no. 3 in Susitna Hydroelectric Project document index. "September 1982." |