Project construction requirements scheduling, Task 2, Surveys and site facilities /
"The access road studies being undertaken are evaluation against various criteria. ... The one criteria this paper addresses is scheduling."--Page 1.
Saved in:
Alternate Title: | Task 2, Surveys and site facilities. Project construction requirements, scheduling. Alaska Power Authority, Susitna Hydroelectric Project. Project construction requirements, scheduling. Task 2, Surveys and site facilities Project construction requirements, scheduling Subtask 2.10, Access road Surveys and site facilities Susitna Hydroelectric Project. Access road studies. Project construction requirements, scheduling Susitna Hydroelectric Project. Project construction requirements scheduling, Task 2, Surveys and site facilities. Subtask 2.10, Access road |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. Acres American Incorporated. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3310 SUS 81 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3310. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "The access road studies being undertaken are evaluation against various criteria. ... The one criteria this paper addresses is scheduling."--Page 1. |
---|---|
Physical Description: | 4, 4 leaves : ill. ; 28 cm. + 1 map (blue-line ; 66 x 94 cm.) |
Notes: | At head of title: Alaska Power Authority, Susitna Hydroelectric Project. "October 1981." "September 1981"--Cover. Folded map in pocket. |