Subtask 7.10, Aquatic Studies procedures manual. Phase I. Final draft /

To insure adequate information is available to determine the impacts of the proposed hydroelectric project and to design proper mitigative strategies, a two-phase data collection program has been developed. This manual addresses Phase I (July 1, 1980-December 31, 1981) procedures to be conducted wit...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Subtask 7.10, Aquatic studies procedures manual. Phase I. Final draft

Aquatic studies procedures manual. Phase I. Final draft

Phase I, Final draft
Corporate Author: Alaska. Susitna Hydro Aquatic Studies.
Corporate Contributor(s):Acres American Incorporated.

Susitna Hydroelectric Project.

Alaska Power Authority.
Publisher:Alaska Dept. of Fish and Game, Susitna Hydro Aquatic Studies,
Report Numbers:APA 3505

APA 3554

APA 3555

RTS 6

RTS 6a

RTS 6b
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 3505.
Document (Susitna Hydroelectric Project) ; no. 3554-3555.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • [Main report]. (APA 3505 or 3554 ; RTS 6a)
  • Appendices I
  • VIII. (APA 3555 ; RTS 6b).
  • Detailed contents of main report: Introduction
  • Technical procedures: Adult Anadromous Fisheries Studies ; Resident and Juvenile Anadromous Fisheries Studies ; Aquatic Habitat and Instream Flow Studies
  • Data procedures: Adult Anadromous Fisheries Studies ; Resident and Juvenile Anadromous Fisheries Studies ; Aquatic Habitat and Instream Flow Studies
  • Quality control
  • Schedule
  • Personnel.
  • Detailed contents of appendices: Appendices I
  • VIII: Sonar installation and operation manual ; Oscilloscope operation ; Fishwheel operation ; Fish tagging ; Electro-shocking instructions ; Habitat site locations ; RJ sampling techniques ; AH instruction manuals.