Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report /

Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sedimen...

Full description

Saved in:
Bibliographic Details
Alternate Title:2014-2015 Study Implementation Report. Riparian instream flow study (8.6)

Riparian instream flow study, Study plan Section 8.6, Initial Study Report.
Corporate Contributor(s):R2 Resource Consultants,

ABR, Inc.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Riparian instream flow study, Study plan Section 8.6, Initial Study Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Study objectives
  • Study area
  • Methods and variances
  • Results
  • Discussion
  • Conclusion
  • Tables - Figures
  • Appendix A. Riparian vegetation groundwater/surface water study sampling design / prepared by R2 Resource Consultants, Inc., ABR, Inc.