Access plan, recommendation report /

This report presents the results of a multi-disciplinary assessment of tradeoffs between the major environmental concerns and project cost, schedule, construction risk and management needs of the Susitna Project. It reviews three alternatives: Plan 13 North (road from Hurrican to Watana with a spur...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project, Access plan, recommendation report, August 1982

Susitna Hydroelectric Project. Access plan, recommendation report
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 5

APA 287

APA 1340

APA 1582

SUS 79
Series:Document (Susitna Hydroelectric Project) ; no. 5.
Document (Susitna Hydroelectric Project) ; no. 287.
Document (Susitna Hydroelectric Project) ; no. 1340.
Document (Susitna Hydroelectric Project) ; no. 1582.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03679cam a2200697Ia 4500
001 294113
003 SIRSI
005 20130821031904.0
007 ta
007 cr bn||||a||||
007 he bm||||b|c|
008 861201s1982 akuab bt s000 0 eng d
035 |a (OCoLC)41742992 
040 |a WaOLN  |c W7L  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 5 
088 |a APA 287 
088 |a APA 1340 
088 |a APA 1582 
088 |a SUS 79 
090 |a TK1425.S8  |b A23 no. 287 
245 0 0 |a Access plan, recommendation report /  |c prepared by Acres. 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project, Access plan, recommendation report, August 1982 
246 3 |a Susitna Hydroelectric Project.  |p Access plan, recommendation report 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a 118 leaves in various foliations :  |b ill., maps ;  |c 28 cm. 
337 |a unmediated  |b n  |2 rdamedia 
490 1 |a [Document ;  |v no. 5, 287, 1340, 1582] 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a "August 1982." 
510 3 |a Assigned APA Document number 5 in the Susitna Hydroelectric Project document index. Also assigned numbers 287, 1340, and 1582 (duplicate entries). 
510 3 |a Assigned SUS document number 79 in the Susitna Aquatic Impact Assessment Project bibliography. 
513 |a Recommendation report. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a This report presents the results of a multi-disciplinary assessment of tradeoffs between the major environmental concerns and project cost, schedule, construction risk and management needs of the Susitna Project. It reviews three alternatives: Plan 13 North (road from Hurrican to Watana with a spur to Devil Canyon), Plan 16 South (roads from Gold Creek and Hurrican to Devil Canyon and then to Watana), Plan 17 Denali (connecting the Denali Highway with the Watana site and then downriver to Devil Canyon with a raillink from the existing track at Gold Creek to Devil Canyon). 
505 2 |a Identification of access alternatives -- Cost of access alternatives -- Risk to project schedule -- Environmental issues -- Preferences of native organizations -- Relationship to current land stewardship, uses and plans -- Public preferences. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Design and construction. 
650 0 |a Hydroelectric power plants  |x Economic aspects  |z Alaska  |z Susitna River. 
650 4 |a Access roads  |z Alaska  |z Susitna River Region. 
650 0 |a Dams  |x Access roads  |z Alaska  |z Susitna River Region. 
650 0 |a Transportation  |z Alaska  |z Susitna River Region  |x Planning. 
650 0 |a Highway planning  |z Alaska  |z Susitna River Region. 
650 0 |a Roads  |z Alaska  |z Susitna River Region  |x Design and construction. 
650 0 |a Route surveying  |z Alaska  |z Susitna River Region. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 5. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 287. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1340. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1582. 
901 |a 3755  |c TK1425.S8A23 no.287 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/2/APA287.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 00005 
098 |a SUS 00079 
098 |a APA 00287 
098 |a APA 01340 
098 |a APA 01582