Task 2, Surveys & site facilities. Subtask 2.16, Closeout report, hydrographic surveys /
A closeout report on the results from surveys of river cross-sections on the Susitna River from Deadman Creek to Talkeetna to define the river gradient and configuration of the active floodplain.
Saved in:
LEADER | 03401cam a2200661Ia 4500 | ||
---|---|---|---|
001 | 2936115 | ||
003 | SIRSI | ||
005 | 20160922144559.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 160922s1981 akuab t s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)958937993 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 13 | |
088 | |a APA 13 | ||
088 | |a APA 1216 | ||
098 | |a APA 00013 | ||
098 | |a APA 01216 | ||
245 | 0 | 0 | |a Task 2, Surveys & site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys / |c prepared by R & M Consultants, Inc. |
246 | 3 | |a Task 2, Surveys and site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys | |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 2, |p Surveys & site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys | |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 2, |p Surveys and site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys | |
246 | 3 | 0 | |a Surveys & site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys |
246 | 3 | |a Surveys and site facilities. |n Subtask 2.16, |p Closeout report, hydrographic surveys | |
246 | 3 | 0 | |a Subtask 2.16. |p Closeout report, hydrographic surveys |
246 | 3 | 0 | |a Closeout report, hydrographic surveys |
246 | 3 | 0 | |a Hydrographic surveys |
246 | 1 | 4 | |a Hydrographic surveys closeout report |
246 | 3 | |a Susitna Hydroelectric Project. |p Hydrographic surveys closeout report | |
250 | |a Final draft. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1981] | ||
300 | |a 259 in various pagings : |b illustrations, maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 13 | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a At head of cover title: Susitna Hydroelectric Project. | ||
500 | |a "Prepared for Acres American Incorporated." | ||
500 | |a "October 1981." | ||
510 | 3 | |a Assigned APA Document no. 13 in the Susitna Hydroelectric Project document index. Also assigned number 1216 (duplicate entry). | |
500 | |a Series statement from label on cover of copies used by the Harza-Ebasco Susitna Joint Venture research team in its work on the Susitna Hydroelectric Project. | ||
520 | |a A closeout report on the results from surveys of river cross-sections on the Susitna River from Deadman Creek to Talkeetna to define the river gradient and configuration of the active floodplain. | ||
530 | |a Available also in electronic format on the Internet. | ||
650 | 0 | |a Hydrology |z Alaska |z Susitna River. | |
650 | 0 | |a Streamflow |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) | |
710 | 2 | |a Susitna Hydroelectric Project |e sponsoring body. | |
710 | 2 | |a R & M Consultants, |e creator. | |
710 | 2 | |a Acres American Incorporated, |e sponsoring body. | |
710 | 2 | |a Alaska Power Authority, |e issuing body. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. |5 AkARLIS | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 13. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1216. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA13.pdf |z ARLIS Document Server |
901 | |a ARLIS |c orig 201609 | ||
596 | |a 9 10 |