Land status report, Susitna Hydroelectric Project, CIRI lands, village reconveyances, Part I /

Saved in:
Bibliographic Details
Alternate Title:Federal power site classification No. 443, upper Susitna River, Talkeetna Mountains, CIRI lands 12 (B), village reconveyances Sec. 11(a) (1)-(3), Part II, land status.

Condemnation of private lands guide.

History of land classification relating to waterpower and storage sites.
Main Author: Bedard, Bruce R.,
Additional Author(s):Bedard, Bruce R.

Lawrence, Fred F. 1913-
Corporate Contributor(s):Alaska Power Authority,

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 3241
Series:Document (Susitna Hydroelectric Project) ; no. 3241.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:465 leaves in various foliations : ill., maps ; 28 cm.
Notes:"December 7, 1982."

The author provides 12 leaves of main text with 453 leaves of accompanying texts that he has compiled. The accompanying texts includes papers on navigability, Alaska Land Use Council memos, copies of regulations, Federal Register issues, and part of the proceedings of "A Symposium on Withdrawal of Public Lands For Water Resource Projects, March 3, 1970" among many other excerpted documents.

This volume is the first part of a two volume set. The second part is: Federal power site classification No. 443, upper Susitna River, Talkeetna Mountains, CIRI lands 12 (B), village reconveyances Sec. 11(a) (1)-(3), Part II, land status / researched by Bruce R. Bedard.