Settlement process, instream flow relationships report, volume no. 1 /

Saved in:
Bibliographic Details
Alternate Title:Instream flow relationships report. Volume no. 1. Working draft.

Alaska Power Authority, Susitna Hydroelectric Project. Settlement process, instream flow relationships report, volume no. 1

Working draft, settlement process, instream flow relationships report, volume no. 1

Instream flow relationships report, volume no. 1

Title on microfiche: Instream flow relationships report. Vol 1. Settlement process. Working draft.

Draft instream flow relationships report. Volume no. 2.

Instreamflow relationships report. Volume no. 1.

Instream flow relationships report. Volume no. 1.
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.

E. Woody Trihey and Associates.

Woodward-Clyde Consultants.

United States. Federal Energy Regulatory Commission.
Publisher:[Alaska Power Authority?],
Report Numbers:APA 3060 (draft 2)

SUS 455
Original Source:Complemented by (expression): Draft instream flow relationships report. Volume no. 2.

Revision of: Instreamflow relationships report. Volume no. 1.

Revised as: Instream flow relationships report. Volume no. 1.
Edition:Working draft, [2nd draft].
Series:Document (Susitna Hydroelectric Project) ; no. 3060d2.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 04208cam a2200697Ia 4500
001 261649
003 SIRSI
005 20160729140733.0
007 ta
007 he bmu---bbca
007 cr bn||a||||||
008 910830e198502 akuabd bt s000 0 eng d
040 |a UDA  |b eng  |c UDA  |d RLA  |d OCLCQ  |d OCLCA  |d OCLCF  |d OCL  |d OCLCQ  |d RLA 
035 |a (OCoLC)24315718 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S9 no. 455 
050 4 |a TK1425.S8  |b I678 1985 
088 |a APA 3060 (draft 2) 
088 |a SUS 455 
130 0 |a Instream flow relationships report.  |n Volume no. 1.  |s Working draft. 
245 1 0 |a Settlement process, instream flow relationships report, volume no. 1 /  |c prepared for Harza-Ebasco Susitna Joint Venture [by] E. Woody Trihey and Associates and Woodward-Clyde Consultants. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Settlement process, instream flow relationships report, volume no. 1 
246 3 0 |a Working draft, settlement process, instream flow relationships report, volume no. 1 
246 3 0 |a Instream flow relationships report, volume no. 1 
246 1 |i Title on microfiche:  |a Instream flow relationships report.  |n Vol 1. Settlement process. Working draft. 
250 |a Working draft, [2nd draft]. 
260 |a [Anchorage, Alaska?] :  |b [Alaska Power Authority?],  |c [1985] 
300 |a 216 leaves in various foliations :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project ... Working draft. 
500 |a "February 1985." 
500 |a "Federal Energy Regulatory Commission, Project No. 7114." 
510 3 |a Assigned number SUS 455 in the Susitna Aquatic Impact Assessment Project bibliography. 
510 3 |a The final version of this report is assigned APA Document no. 3060 in the Susitna Hydroelectric Project document index. Alaska Resources Library and Information Services has assigned number APA 3060d2 (or "APA 3060 (draft 2)") to this draft version for the Susitna Hydroelectric Project collection. 
500 |a Volumes 1 and 2 of this set serve as a summary to the series: Instream flow relationships report series, technical report. 
500 |a This version is called "the second (working)--draft" in: Comments to the Instream flow relationships report, Volume no. 1, February, 1985, by E. Woody Trihey & Associates and Woodward-Clyde Consultants. 
500 |a This volume is a revision of: Instreamflow relationships report, Volume no. 1. -- Prelimimary draft. (Numbered SUS 437). 
500 |a This volume was revised as: Instream flow relationships report, Volume no. 1. (Numbered APA Document no. 3060 and SUS 602). 
500 |a This version of volume 1 is complemented by the draft of volume 2 issued in December 1985 under the title: Draft instream flow relationships report, Volume no. 2. (Numbered APA Document no. 3061.) 
530 |a Available also in microfiche format and electronic format on the Internet. 
504 |a Includes bibliographical references (leaves VII-1 to VII-8). 
650 0 |a Instream flow  |z Alaska  |z Susitna River. 
650 0 |a Stream measurements  |z Alaska  |z Susitna River. 
650 0 |a Fishes  |x Habitat  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project  |x Environmental aspects. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a E. Woody Trihey and Associates. 
710 2 |a Woodward-Clyde Consultants. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
730 0 |i Complemented by (expression):  |a Draft instream flow relationships report.  |n Volume no. 2. 
730 0 |i Revision of:  |a Instreamflow relationships report.  |n Volume no. 1. 
730 0 |i Revised as:  |a Instream flow relationships report.  |n Volume no. 1. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3060d2. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/4/SUS455.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a SUS 00455 
098 |a APA 03060 (draft 2)