Task 6, design development. Subtask 6.14, Scour hole development downstream of high-head dams /

The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project.

Saved in:
Bibliographic Details
Alternate Title:Subtask 6.14, Scour hole development downstream of high-head dams

Scour hole development downstream of high-head dams

Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.14, Scour hole development downstream of high-head dams

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design Development. Subtask 6.14, Scour hole development downstream of high-head dams
Corporate Contributor(s):Acres American Incorporated,

Alaska Power Authority,

Susitna Hydroelectric Project
Publisher:Alaska Power Authority,
Report Numbers:APA 78

APA 1287

SUS 72
Series:Document (Susitna Hydroelectric Project) ; no. 78.
Document (Susitna Hydroelectric Project) ; no. 1287.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03023cam a2200613Ia 4500
001 252469
003 SIRSI
005 20161020133454.0
007 ta
007 he bm|b|c||||
007 cr bn||a||||||
008 860605s1982 akua bt s000 0 eng d
040 |a AkU  |b eng  |c UAF  |d RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)42983437 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 78 
088 |a APA 78 
088 |a APA 1287 
088 |a SUS 72 
245 0 0 |a Task 6, design development.  |n Subtask 6.14,  |p Scour hole development downstream of high-head dams /  |c prepared by Acres. 
246 3 0 |a Subtask 6.14,  |p Scour hole development downstream of high-head dams 
246 3 0 |a Scour hole development downstream of high-head dams 
246 1 4 |a Susitna Hydroelectric Project.  |n Task 6,  |p Design development.  |n Subtask 6.14,  |p Scour hole development downstream of high-head dams 
246 1 6 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 6,  |p Design Development.  |n Subtask 6.14,  |p Scour hole development downstream of high-head dams 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a 28 pages in various pagings :  |b illustrations ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a Cover title. 
500 |a "March 1982"--Cover. 
510 3 |a Assigned APA Document no. 78 in the Susitna Hydroelectric Project document index. Also assigned no. 1287 (duplicate entry). 
510 3 |a Assigned SUS document no. 72 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Scour (Hydraulic engineering) 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Design and construction. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Dams  |x Design and construction.  |2 fast  |0 (OCoLC)fst00887325 
650 7 |a Scour (Hydraulic engineering)  |2 fast  |0 (OCoLC)fst01109236 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |a Acres American Incorporated,  |e creator. 
710 2 |a Alaska Power Authority,  |e issuing body. 
710 2 |a Susitna Hydroelectric Project  |e sponsoring body. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 78. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1287. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA78.pdf  |z ARLIS Document Server 
901 |a 3755 
098 |a APA 00078 
098 |a SUS 00072 
098 |a APA 01287 
596 |a 9 10 11