Task 6, design development. Subtask 6.14, Scour hole development downstream of high-head dams /
The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project.
Saved in:
Alternate Title: | Subtask 6.14, Scour hole development downstream of high-head dams Scour hole development downstream of high-head dams Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.14, Scour hole development downstream of high-head dams Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design Development. Subtask 6.14, Scour hole development downstream of high-head dams |
---|---|
Corporate Contributor(s): | Acres American Incorporated, Alaska Power Authority, Susitna Hydroelectric Project |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 78 APA 1287 SUS 72 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 78. Document (Susitna Hydroelectric Project) ; no. 1287. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project. |
---|---|
Physical Description: | 28 pages in various pagings : illustrations ; 28 cm |
Notes: | Cover title. "March 1982"--Cover. |
Bibliography: | Includes bibliographical references. |