Task 6, design development. Subtask 6.14, Scour hole development downstream of high-head dams /

The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project.

Saved in:
Bibliographic Details
Alternate Title:Subtask 6.14, Scour hole development downstream of high-head dams

Scour hole development downstream of high-head dams

Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.14, Scour hole development downstream of high-head dams

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design Development. Subtask 6.14, Scour hole development downstream of high-head dams
Corporate Contributor(s):Acres American Incorporated,

Alaska Power Authority,

Susitna Hydroelectric Project
Publisher:Alaska Power Authority,
Report Numbers:APA 78

APA 1287

SUS 72
Series:Document (Susitna Hydroelectric Project) ; no. 78.
Document (Susitna Hydroelectric Project) ; no. 1287.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:The purpose of this study is to investigate the development of scour holes in unlined plunge pools downstream of high-head dams and to formulate a relationship for determination of scour hole depth to assist in the feasibility level spillway layouts of the Susitna Hydroelectric Project.
Physical Description:28 pages in various pagings : illustrations ; 28 cm
Notes:Cover title.

"March 1982"--Cover.
Bibliography:Includes bibliographical references.