Transmission line corridor screening. Closeout report. Task 8, Transmission /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Transmission line corridor screening. Closeout report. Task 8, Transmission Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.01, Closeout report. Transmission line corridor screening Task 8, Transmission |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 342 APA 1348 SUS 68 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 342. Document (Susitna Hydroelectric Project) ; no. 1348. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Physical Description: | 110 p. in various pagings (some folded) : ill., maps ; 28 cm. |
---|---|
Notes: | At head of title: Susitna Hydroelectric Project. "March 1982." |
Report Type: | Final report. |
Bibliography: | Includes bibliographical references. |