Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative /
"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.
Saved in:
Alternate Title: | Title on fiche header: Susitna Hydroelectric Project, tunnel alternative report, Task 6, design development Tunnel alternative report. Task 6, Design development Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative Investigate tunnel alternative Subtask 6.02, Closeout report, investigate tunnel alternative |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Acres American Incorporated. |
Publisher: | Acres American, |
Report Numbers: | APA 335 APA 2758 SUS 62 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 335. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Summary
- Scope of work
- Conceptual tunnel schemes
- Tunnel design and construction considerations
- Screening of conceptual tunnel schemes
- Preferred tunnel scheme
- Comparison with Devil Canyon dam scheme
- Conclusions and recommendations.