Task 6, design development. Subtask 6.02, Closeout report, investigate tunnel alternative /

"The objective of the Subtask 6.02 study is to undertake a preliminary assessment of the feasibility of using a major tunnel to develop hydroelectric power on the Susitna River between the proposed Watana and Devil Canyon dam sites."--P. 1-1.

Saved in:
Bibliographic Details
Alternate Title:Title on fiche header: Susitna Hydroelectric Project, tunnel alternative report, Task 6, design development

Tunnel alternative report. Task 6, Design development

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.02, Closeout report, investigate tunnel alternative

Investigate tunnel alternative

Subtask 6.02, Closeout report, investigate tunnel alternative
Corporate Contributor(s):Alaska Power Authority.

Acres American Incorporated.
Publisher:Acres American,
Report Numbers:APA 335

APA 2758

SUS 62
Series:Document (Susitna Hydroelectric Project) ; no. 335.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary
  • Scope of work
  • Conceptual tunnel schemes
  • Tunnel design and construction considerations
  • Screening of conceptual tunnel schemes
  • Preferred tunnel scheme
  • Comparison with Devil Canyon dam scheme
  • Conclusions and recommendations.