Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project /
"The purpose of this report is to provide environmental input into the selection of an access plan for the Susitna Hydroelectric Project and to recommend an access plan that, from a total environmental standpoint, is judged to have the least impact, both short-term and long-term."--P. 1-1.
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Environmental studies. Subtask 7.14, Environmental analysis of alternative access plans Alaska Power Authority, Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project Environmental studies. Subtask 7.14, Environmental analysis of alternative access plans Subtask 7.14, Environmental analysis of alternative access plans Environmental analysis of alternative access plans |
---|---|
Corporate Contributor(s): | Terrestrial Environmental Specialists. Susitna Hydroelectric Project. Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 8 APA 296 APA 1324 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 8. Document (Susitna Hydroelectric Project) ; no. 296. Document (Susitna Hydroelectric Project) ; no. 1324. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04118cam a2200673Ia 4500 | ||
---|---|---|---|
001 | 250952 | ||
003 | SIRSI | ||
005 | 20130823024624.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr cn||||a|||| | ||
008 | 830930s1981 akub t s000 0 eng d | ||
035 | |a (OCoLC)41686232 | ||
040 | |a Ak |c ALK |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 8 | ||
088 | |a APA 296 | ||
088 | |a APA 1324 | ||
090 | |a TK1425.S8 |b E58 no. 1324 | ||
090 | |a TK1425.S9 |b S95 no. 7.14 | ||
245 | 0 | 0 | |a Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project / |c by Terrestrial Environmental Specialists, Inc. ; for Acres American, Inc. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Environmental studies. |n Subtask 7.14, |p Environmental analysis of alternative access plans |
246 | 3 | |a Alaska Power Authority, Environmental socioeconomic and land use analysis of alternative access plans for the Susitna Hydroelectric Project | |
246 | 3 | 0 | |a Environmental studies. |n Subtask 7.14, |p Environmental analysis of alternative access plans |
246 | 3 | 0 | |a Subtask 7.14, |p Environmental analysis of alternative access plans |
246 | 3 | 0 | |a Environmental analysis of alternative access plans |
260 | |a [Alaska] : |b Alaska Power Authority, |c [1981] | ||
300 | |a 115 leaves in various foliations : |b maps ; |c 28 cm. | ||
337 | |a unmediated |b n |2 rdamedia | ||
490 | 1 | |a [Document ; |v no. 8, 296, 1324] | |
500 | |a At head of title: Alaska Power Authority. | ||
500 | |a "October 1981." | ||
500 | |a An earlier version of this report is also dated October 1981 and has nearly the same text (the main difference being paging errors), but has a cover from Acres. It was issued: Buffalo, N.Y. : Acres American Incorporated, [1981]. That printing was assigned APA number 11, and is called "Draft" in the Susitna Hydroelectric Project document index. | ||
500 | |a This same report (with different front and back covers) was issued also by: Phoenix, N.Y. : Terrestrial Environmental Specialists, Inc., [1981]. That printing was assigned APA numbers 10, 84, and 1327 and SUS number 56. | ||
510 | 3 | |a Assigned APA Document no. 8 in Susitna Hydroelectric Project document index. Also assigned numbers 296 and 1324 (duplicate number). | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a "The purpose of this report is to provide environmental input into the selection of an access plan for the Susitna Hydroelectric Project and to recommend an access plan that, from a total environmental standpoint, is judged to have the least impact, both short-term and long-term."--P. 1-1. | ||
505 | 0 | |a Introduction -- Environmental analysis. Methods ; Criteria for evaluation ; Description of environmental resources ; Impact assessment ; Habitat value comparison ; Mitigation ; Conclusions -- Socioeconomic and land use analysis. Methods ; Criteria for evaluation ; Description of resources ; Impact assessment ; Mitigation ; Conclusions. | |
650 | 0 | |a Highway planning |z Alaska |z Susitna River Region. | |
650 | 0 | |a Railroad tracks |z Alaska |z Susitna River Valley |x Planning. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
710 | 2 | |a Terrestrial Environmental Specialists. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Access roads |z Alaska |z Susitna River Region. | |
650 | 4 | |a Access roads |z Alaska |z Susitna River Region. | |
650 | 0 | |a Transportation |z Alaska |z Susitna River Region |x Planning. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 8. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 296. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1324. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1324.pdf |z ARLIS Document Server |
901 | |a 3755 | ||
596 | |a 9 10 11 23 24 | ||
098 | |a APA 00008 | ||
098 | |a APA 00296 | ||
098 | |a APA 01324 |