Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site /

"The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site

Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site

Closeout report. Evaluation of arch dam at Devil Canyon site

Evaluation of arch dam at Devil Canyon site

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 337

APA 1280

SUS 73
Series:Document (Susitna Hydroelectric Project) ; no. 337.
Document (Susitna Hydroelectric Project) ; no. 1280.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf 1-1.
Physical Description:58 p. in various pagings : ill., 3 maps, plans ; 28 cm.
Notes:"March 1982."

At head of title: Susitna Hydroelectric Project.

At head of caption title on table of contents page: Alaska Power Authority, Susitna Hydroelectric Project.
Bibliography:Includes bibliographical references (p. [10-3]-[10-4]).