Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum /

This is a study of existing aquatic habitats in the Susitna River watershed conduced as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operati...

Full description

Saved in:
Bibliographic Details
Alternate Title:Technical memorandum, 2013-2014 instream flow winter studies
Corporate Contributor(s):R2 Resource Consultants.

Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 236
Series:Susitna-Watana Hydroelectric Project document ; no. 236.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This is a study of existing aquatic habitats in the Susitna River watershed conduced as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operational scenarios. This technical memorandum describes the methods applied and information collected as part of the 2013-2014 winter studies. Results of this study are presented in a different technical memorandum.
Physical Description:v, 57 p. : col. maps, col. charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"September 2014."

ARLIS assigned report number: SuWa 236.

This document was filed to FERC as Attachment H to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. (SuWa 228).

Pages 38-40 (containing figures 2-4) were corrected by "Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum addendum" (SuWa 272) issued in December 2014. However, those replacement pages are numbered 2-4 to suit this addendum rather than the corresponding pages in this document.
Report Type:September 17, 2014 technical memorandum filings.

Technical memorandum.
Related Titles:Originally submitted as Attachment H to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 228 SuWa 228

Replaced in part by (work): R2 Resource Consultants. Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum addendum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 272 SuWa 272 Pages 38-40 only of SuWa 236 are replaced by document SuWa 272.
Bibliography:Includes bibliographical references (pages 23-28).