Probable maximum flood (PMF) study, Study plan Section 16.5, Initial Study Report /

An inflow design flood for the proposed Watana Dam in the Susitna River watershed will be based on the "probable maximum flood" (PMF), which is modeled in this study. The inflow design flood is used in the design of spillways and other structures. The PMF inflow hydrograph will be routed t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 16.5, Probable maximum flood (PMF) study. Draft.

Initial Study Report. Probable maximum flood (PMF) study (16.5)

Susitna-Watana Hydroelectric Project probable maximum flood study.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

MWH Americas, Inc.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Susitna-Watana Hydroelectric Project probable maximum flood study. Final draft.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Part A. Sections 1-6, 8-10
  • Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report)
  • Part C. Executive summary and Section 7
  • Attachment 1. Susitna-Watana Hydroelectric Project probable maximum flood study : final draft / prepared by MWH ; [prepared by John Haapala]. May 2014. "AEA11-022." "Report 14-02-REP v1.0"
  • Part D. Supplemental information to June 2014 Initial Study Report.