Fish and aquatics instream flow study, Study plan Section 8.5, Initial Study Report /

A study of biological communities and existing aquatic habitats in the Susitna River is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project for submission to the Federal Energy Regulatory Commission. The goal is to provide quantitative indices of existing aquatic habi...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.5, Fish and aquatics instream flow study.

Initial Study Report. Fish and aquatics instream flow study (8.5)

Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report.
Corporate Contributor(s):R2 Resource Consultants,

Brailey Hydrologic (Firm),

Geovera (Firm),

Geo-Watershed Scientific (Firm),

Golder Associates,

HDR, Inc.,

Miller Ecological Consultants,

MWH Americas, Inc.,

Tetra Tech, Inc.,

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 05598cam a2200733Ia 4500
001 2379775
003 SIRSI
005 20161222194818.0
007 ta
007 cr cn||a||||||
008 150320m20142015akuabd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCF  |d RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)905370552 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 8.5 
088 |a SuWa 223 
130 0 |a Initial Study Report.  |n Study plan Section 8.5,  |p Fish and aquatics instream flow study. 
245 1 0 |a Fish and aquatics instream flow study, Study plan Section 8.5, Initial Study Report /  |c prepared by R2 Resource Consultants, Inc. 
246 1 7 |a Initial Study Report.  |p Fish and aquatics instream flow study (8.5) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 870 pages in various pagings :  |b color illustrations, color maps, color charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
500 |a Appendices A and C prepared also by Brailey Hydrologic, Geovera, and GWS. 
500 |a Appendices I and O prepared by Golder Associates. 
500 |a Appendices J, K, and N prepared also by Miller Ecological Consultants, Tetra Tech, HDR, GW Scientific [that is, Geo-Watershed Scientific], and Montgomery Watson Harza [that is, MWH Americas, Inc.?]. 
580 |a Succeeded by: Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report / prepared by R2 Resource Consultants, Inc. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). 
530 |a Available also in electronic format on the Internet. 
520 |a A study of biological communities and existing aquatic habitats in the Susitna River is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project for submission to the Federal Energy Regulatory Commission. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operational scenarios. The study area emcompasses the Susitna River downstream of the proposed Watana Dam at river mile 187.1. 
505 0 |a Part A. Sections 1-6, 8-10 -- Appendix A. Hydrologic data collection methods -- Appendix B. Biological cues study -- Appendix C. 2013 moving boat ADCP measurements -- Appendix D. GINA initial study report 8.5 data files -- Appendix E. Tributary gaging site schematics -- Appendix F. Tributary gaging representative site photos -- Appendix G. HSC histogram plots -- Appendix H. Periodicity tables -- Appendix I. Lower river hydraulic model calibration -- Figures -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Appendix J. Representative years -- Appendix K. Hydrology and Version 2 Open-water Flow Routing Model -- Appendix L. 2012-2013 instream flow winter pilot studies -- Appendix M. Habitat suitability curve development -- Appendix N. Middle river fish habitat and riverine modeling proof of concept -- Appendix O. Fish habitat modeling in lower river -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A, pages 97-107). 
650 0 |a Freshwater habitats  |z Alaska  |z Susitna River. 
650 0 |a Instream flow  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
610 2 7 |a Susitna-Watana Hydroelectric Project.  |2 fast  |0 (OCoLC)fst01917261 
650 7 |a Freshwater habitats.  |2 fast  |0 (OCoLC)fst01749467 
650 7 |a Instream flow.  |2 fast  |0 (OCoLC)fst01740138 
651 7 |a Alaska  |z Susitna River Watershed.  |2 fast  |0 (OCoLC)fst01265160 
710 2 |a R2 Resource Consultants,  |e author. 
710 2 |a Brailey Hydrologic (Firm),  |e author. 
710 2 |a Geovera (Firm),  |e author. 
710 2 |a Geo-Watershed Scientific (Firm),  |e author. 
710 2 |a Golder Associates,  |e author. 
710 2 |a HDR, Inc.,  |e author. 
710 2 |a Miller Ecological Consultants,  |e author. 
710 2 |a MWH Americas, Inc.,  |e author. 
710 2 |a Tetra Tech, Inc.,  |e author. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
730 0 |i Succeeded by (expression):  |a Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
098 |a SuWa 00223 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec8-5ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this report.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 8.5). List includes related Initial Study Reports.  |z ARLIS Document Server 
596 |a 10