Fish and aquatics instream flow study, Study plan Section 8.5, Initial Study Report /

A study of biological communities and existing aquatic habitats in the Susitna River is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project for submission to the Federal Energy Regulatory Commission. The goal is to provide quantitative indices of existing aquatic habi...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 8.5, Fish and aquatics instream flow study.

Initial Study Report. Fish and aquatics instream flow study (8.5)

Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report.
Corporate Contributor(s):R2 Resource Consultants,

Brailey Hydrologic (Firm),

Geovera (Firm),

Geo-Watershed Scientific (Firm),

Golder Associates,

HDR, Inc.,

Miller Ecological Consultants,

MWH Americas, Inc.,

Tetra Tech, Inc.,

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:A study of biological communities and existing aquatic habitats in the Susitna River is being conducted as part of the planning of the Susitna-Watana Hydroelectric Project for submission to the Federal Energy Regulatory Commission. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operational scenarios. The study area emcompasses the Susitna River downstream of the proposed Watana Dam at river mile 187.1.
Physical Description:870 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.

Appendices A and C prepared also by Brailey Hydrologic, Geovera, and GWS.

Appendices I and O prepared by Golder Associates.

Appendices J, K, and N prepared also by Miller Ecological Consultants, Tetra Tech, HDR, GW Scientific [that is, Geo-Watershed Scientific], and Montgomery Watson Harza [that is, MWH Americas, Inc.?].
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A, pages 97-107).
Related Items:Succeeded by: Fish and aquatics instream flow study, Study plan Section 8.5, 2014-2015 Study Implementation Report / prepared by R2 Resource Consultants, Inc. -- November 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).