Environmental implication of Susitna Project alternatives /

Part A considers environmental implications for the Susitna Hydroelectric Project. Part B considers environmental implications for the electric generating options that are alternative to this project, specifically, coal fired facilities at Beluga and Nenana, facilities fired by natural gas from the...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Environmental implication of Susitna Project alternatives

Susitna Hydroelectric Project. Economic and financial update. Supplemental report, environmental implications of Susitna Project alternatives

Economic and financial update. Supplemental report, environmental implications of Susitna Project alternatives

Title on Part B's title page (this also appear on the cover): Environmental implications of Susitna Project alternatives
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 466
Edition:[Draft].
Series:Document (Susitna Hydroelectric Project) ; no. 466.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03285cam a2200565Ia 4500
001 2355761
003 SIRSI
005 20141023194549.0
007 ta
007 cr bn||a||||||
008 060905s1983 akua bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)71253206 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 466 
088 |a APA 466 
245 0 0 |a Environmental implication of Susitna Project alternatives /  |c submitted by Harza-Ebasco Susitna Joint Venture to the Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Environmental implication of Susitna Project alternatives 
246 1 4 |a Susitna Hydroelectric Project.  |p Economic and financial update.  |p Supplemental report, environmental implications of Susitna Project alternatives 
246 3 |a Economic and financial update.  |p Supplemental report, environmental implications of Susitna Project alternatives 
246 1 |i Title on Part B's title page (this also appear on the cover):  |a Environmental implications of Susitna Project alternatives 
250 |a [Draft]. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1983] 
300 |a 166 p. in various pagings :  |b ill. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 466 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a Stamped on cover: Draft. 
500 |a "September 1983." 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 466 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
500 |a Stamped on cover: Confidential; Privileged work product prepared in anticipation of litigation; restricted distribution. 
520 |a Part A considers environmental implications for the Susitna Hydroelectric Project. Part B considers environmental implications for the electric generating options that are alternative to this project, specifically, coal fired facilities at Beluga and Nenana, facilities fired by natural gas from the Cook Inlet and North Slope, and the Chakachmna hydroelectric alternative. 
505 0 |a Part A. Alternative schemes for hydroelectric development of the Susitna River basin -- Part B. A comparison of environmental impacts associated with electric generating projects alternative to Susitna hydroelectric development. 
504 |a Includes bibliographical references (pages B-83 - B-85). 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
772 0 |t Economic and financial update.  |b [Draft].  |d [Anchorage, Alaska] : Alaska Power Authority, [1983]  |r APA 467  |w (OCoLC)77797213 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 466. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/4/APA466.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201410 
596 |a 9 10 
098 |a APA 00466