Flood frequency analysis /

A flood frequency analysis was made for the Susitna River at the Gold Creek gage based on annual May-June floods (using 1950-1982 data) and July-September maximum floods (using 1949-1982 data). The resulting 50-year flood peak and volumes were transposed to the Watana and Devil Canyon damsites to de...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Flood frequency analysis
Corporate Contributor(s):Susitna Hydroelectric Project.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 474
Series:Document (Susitna Hydroelectric Project) ; no. 474.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:A flood frequency analysis was made for the Susitna River at the Gold Creek gage based on annual May-June floods (using 1950-1982 data) and July-September maximum floods (using 1949-1982 data). The resulting 50-year flood peak and volumes were transposed to the Watana and Devil Canyon damsites to derive the 50-year flood hydrograph for the sites.
Physical Description:ii, 3, [15] p. : 1 map, 12 charts ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"January 1984."

"Susitna File No. 42.4."

"Federal Energy Regulatory Commission, Project No. 7114"--Cover.
Report Type:Final report.
Bibliography:Includes bibliographical references (p. 3).