Acres American, Appendix A, Hydrological studies, Susitna Hydroelectric Project feasibility report, pages A-4-5 through A-4-8.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project feasibility report. Volume 4, Appendix A, Hydrological studies. Selections.

Appendix A, Hydrological studies, Susitna Hydroelectric Project feasibility report, pages A-4-5 through A-4-8

Title entered in the Susitna Hydroelectric Project document index as: Hydrological studies Susitna Hydroelectric Project feasibility report Appendix A
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 1142
Series:Document (Susitna Hydroelectric Project) ; no. 1142.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02619cam a2200493Ia 4500
001 2052057
003 SIRSI
005 20140818181132.0
007 ta
007 cr bn||a||||||
008 140818s1983 aku t s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)887756962 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 1142 
088 |a APA 1142 
130 0 |a Susitna Hydroelectric Project feasibility report.  |n Volume 4, Appendix A,  |p Hydrological studies.  |k Selections. 
245 1 0 |a Acres American, Appendix A, Hydrological studies, Susitna Hydroelectric Project feasibility report, pages A-4-5 through A-4-8. 
246 3 0 |a Appendix A, Hydrological studies, Susitna Hydroelectric Project feasibility report, pages A-4-5 through A-4-8 
246 1 |i Title entered in the Susitna Hydroelectric Project document index as:  |a Hydrological studies Susitna Hydroelectric Project feasibility report Appendix A 
260 |a [Anchorage, Alaska :  |b Alaska Power Authority,  |c 1982] 
300 |a leaves A4-5 - A4-8 ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 1142 
500 |a Title from label on cover. 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 1142 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
580 |a A four-page excerpt from Volume 4 (Appendix A) of: Susitna Hydroelectric Project feasibility report / prepared by Acres. Final draft. [Anchorage, Alaska] : Alaska Power Authority, [1982]. APA 179. 
500 |a This excerpt from Appendix A includes Section 3, Temperature regime of Susitna River below dams. 
650 0 |a Water temperature  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Environmental aspects  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
773 0 8 |i Excerpt from:  |t Susitna Hydroelectric Project feasibility report. Volume 4, Appendix A, Hydrological studies.  |b Final draft.  |d [Anchorage, Alaska] : Alaska Power Authority, [1982]  |r APA 179  |w (OCoLC)49820541 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1142. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/11/APA1142.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 01142