Aquatic program detailed plan of study, fiscal year 1984 /
Presents a detailed plan of study for aquatic program impact assessment and mitigation plan refinement efforts in fiscal year 1984 in regards to effects of the Susitna Hydroelectric Project on aquatic resources in the Susitna River. Includes plans to accomplish all field data collection, analysis, a...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Aquatic program detailed plan of study, fiscal year 1984 Aquatic programs, fiscal year 1984 detailed plan of study |
---|---|
Corporate Contributor(s): | Susitna Hydroelectric Project. HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 1189 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 1189. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02844cai a2200541Ia 4500 | ||
---|---|---|---|
001 | 2048155 | ||
003 | SIRSI | ||
005 | 20140723212517.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 140723d19841984aku x l tb s0 2eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)884474631 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1189 | |
088 | |a APA 1189 | ||
245 | 0 | 0 | |a Aquatic program detailed plan of study, fiscal year 1984 / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Aquatic program detailed plan of study, fiscal year 1984 | |
246 | 1 | 4 | |a Aquatic programs, fiscal year 1984 detailed plan of study |
260 | |a [Anchorage] : |b Alaska Power Authority, |c [1984] | ||
300 | |a 1 v. (loose-leaf) : |b ill. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 1189 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "January 1984." | ||
500 | |a Kept up-to-date with revisions. Initial date or revision dates indicated on header of most leaves. Revisions made in January or March of 1984. | ||
500 | |a "Federal Energy Regulatory Commission, Project No. 7114"--Cover. | ||
510 | 3 | |a Assigned APA document no. 1189 in Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Presents a detailed plan of study for aquatic program impact assessment and mitigation plan refinement efforts in fiscal year 1984 in regards to effects of the Susitna Hydroelectric Project on aquatic resources in the Susitna River. Includes plans to accomplish all field data collection, analysis, assessment and mitigation planning activities scheduled for this period. | ||
504 | |a Includes bibliographical references (p. 6-1 - 6-2). | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Research. |
650 | 0 | |a Environmental monitoring |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Fishes |x Effect of dams on |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Freshwater habitats |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Research. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1189. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/11/APA1189.pdf |z Scanned copy with latest known updates. |z ARLIS Document Server |
901 | |a 3755 |c orig | ||
596 | |a 9 10 | ||
098 | |a APA 01189 |