FERC license application. Exhibit D /

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. FERC license application. Exhibit D

Title at head of table of contents: Exhibit D. Project costs and financing
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 1373
Edition:1st draft.
Series:Document (Susitna Hydroelectric Project) ; no. 1373.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02252cam a2200493Ia 4500
001 2047286
003 SIRSI
005 20140716143135.0
007 ta
007 cr bn||a||||||
008 140715e19820924akuabd bt s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)883689572 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F471 no. 1373 
088 |a APA 1373 
245 0 0 |a FERC license application.  |n Exhibit D /  |c prepared by Acres. 
246 3 |a Susitna Hydroelectric Project.  |p FERC license application.  |n Exhibit D 
246 1 |i Title at head of table of contents:  |a Exhibit D.  |p Project costs and financing 
250 |a 1st draft. 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a [164] p. :  |b ill., maps, charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Susitna Hydroelectric Project. 
500 |a "September 24, 1982." 
510 3 |a Assigned APA Document no. 1373 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
505 0 |a Estimates of cost -- Estimated annual project costs -- Market value of project power -- Evaluation of alternative energy plans -- Consequences of license denial -- Financing. 
504 |a Includes bibliographical references. 
610 2 0 |a Susitna Hydroelectric Project. 
650 0 |a Dams  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Design and construction  |x Estimates  |z Alaska  |z Susitna River. 
650 0 |a Dams  |x Licenses  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Licenses  |z Alaska  |z Susitna River. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
901 |a 3755  |c orig 
787 0 8 |i Revised as:  |t FERC license application. Exhibit D, Project costs and financing.  |b Draft.  |d [Anchorage, Alaska] : Alaska Power Authority, [1982]  |r APA 167  |w (OCoLC)883787860 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1373. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1373.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 01373