Susitna and Chakachamna preliminary decision document, environmental-energy-cost /
Describes environmental issues, energy generation, and cost estimates in regards to the Chakachamna Hydroelectric Project and the Susitna Hydroelectric Project (the Low Watana dam with cost estimates for the non-expandable alternative).
Saved in:
Alternate Title: | AEA large hydro evaluation, preliminary decision document |
---|---|
Corporate Contributor(s): | HDR Alaska, Inc., Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 219 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 219. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Describes environmental issues, energy generation, and cost estimates in regards to the Chakachamna Hydroelectric Project and the Susitna Hydroelectric Project (the Low Watana dam with cost estimates for the non-expandable alternative). |
---|---|
Physical Description: | 28, [14], 12, 8 p. ; 28 cm. |
Notes: | "Prepared for the Alaska Energy Authority." "November 12, 2010." ARLIS assigned report number: SuWa 218. Posted on the Alaska Energy Authority's "Railbelt large hydro reports" webpage; available as of June 16, 2014. "AIDEA -08-007-HDR." |
Bibliography: | Includes bibliographical references (p. 27-28). |