Susitna-Low Watana & Chakachamna projects, large hydro evaluation of two projects, preliminary decision document, environmental & regulatory issues /
Describes engineering, environmental, and regulatory issues in regards to the Susitna Hydroelectric Project (the Low Watana non-expandable alternative) and the Chakachamna Hydroelectric Project.
Saved in:
Alternate Title: | Alaska Energy Authority, preliminary decision document, environmental & regulatory issues, large hydro preliminary evaluation, Chakachamna Project & Susitna / Low Watana Project |
---|---|
Corporate Contributor(s): | Hatch Associates Consultants, Inc., Alaska Energy Authority. R & M Consultants. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 218 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 218. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Summary: | Describes engineering, environmental, and regulatory issues in regards to the Susitna Hydroelectric Project (the Low Watana non-expandable alternative) and the Chakachamna Hydroelectric Project. |
---|---|
Physical Description: | 18, 18, 2 p. ; 28 cm. |
Notes: | "Prepared for Alaska Energy Authority." "November 14, 2010." ARLIS assigned report number: SuWa 218. Posted on the Alaska Energy Authority's "Railbelt large hydro reports" webpage; available as of June 16, 2014. "R&M Consultants No. 1158.21-8." |
Bibliography: | Includes bibliographical references (p. 18 (first paging sequence)). |