Susitna Hydro evaluation project : seminar on the development of large hydroelectric projects with a focus on the Susitna Project /
Saved in:
Alternate Title: | The section on cost, economics, and financing has title: Susitna Dam projects: cost, economics, and financing : seminar on the development of large hydroelectric projects with a focus on the Susitna Project Seminar on the development of large hydroelectric projects with a focus on the Susitna Project |
---|---|
Corporate Contributor(s): | Northern Economics (Firm), Devine Tarbell & Associates, Inc., HDR Alaska, Inc., Alaska Energy Authority. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 213 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 213. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02957cam a2200553Ia 4500 | ||
---|---|---|---|
001 | 2040370 | ||
003 | SIRSI | ||
005 | 20140620040318.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 140619s2008 akuab s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)881504476 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 213 | |
088 | |a SuWa 213 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Susitna Hydro evaluation project : |b seminar on the development of large hydroelectric projects with a focus on the Susitna Project / |c HDR Alaska, Northern Economics, Inc., Devine Tarbell & Associates, Inc. |
246 | 1 | |i The section on cost, economics, and financing has title: |a Susitna Dam projects: cost, economics, and financing : |b seminar on the development of large hydroelectric projects with a focus on the Susitna Project | |
246 | 3 | 0 | |a Seminar on the development of large hydroelectric projects with a focus on the Susitna Project |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2008?] | ||
300 | |a [141] p. : |b col. ill., col. maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 213 | |
500 | |a "Presented to Alaska Energy Authority." | ||
500 | |a "November 2008." | ||
500 | |a Originally presented as a slide presentation. No commentary. | ||
500 | |a ARLIS assigned report number: SuWa 213 (posted on the Alaska Energy Authority's "Railbelt large hydro reports" webpage; available as of June 19, 2014). | ||
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a Project history. (30 p.) -- Regulatory and environmental. (p. 47) -- Cost, economics, and financing. ([15] p.) -- Hydroelectric equipment, hydrology, and energy production. (23 p.) -- Susitna Project civil works considerations. (26 p.). | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Evaluation. | |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Evaluation. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |x Evaluation. | |
650 | 0 | |a Dams |z Alaska |x Evaluation. | |
650 | 0 | |a Water-power |z Alaska |x Evaluation. | |
651 | 0 | |a Susitna River (Alaska) |x Power utilization |x Evaluation. | |
710 | 2 | |a Northern Economics (Firm), |e author. | |
655 | 0 | |a Business presentations. | |
710 | 2 | |a Devine Tarbell & Associates, Inc., |e author. | |
710 | 2 | |a HDR Alaska, Inc., |e author. | |
710 | 2 | |a Alaska Energy Authority. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 213. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa213/SuWa213-History.pdf |3 Direct link to the first part (Project history). |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa213/index.html |3 List of all parts of this document |z ARLIS Document Server |
098 | |a SuWa 00213 | ||
596 | |a 9 10 |