Susitna Hydro evaluation project : seminar on the development of large hydroelectric projects with a focus on the Susitna Project /

Saved in:
Bibliographic Details
Alternate Title:The section on cost, economics, and financing has title: Susitna Dam projects: cost, economics, and financing : seminar on the development of large hydroelectric projects with a focus on the Susitna Project

Seminar on the development of large hydroelectric projects with a focus on the Susitna Project
Corporate Contributor(s):Northern Economics (Firm),

Devine Tarbell & Associates, Inc.,

HDR Alaska, Inc.,

Alaska Energy Authority.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 213
Series:Susitna-Watana Hydroelectric Project document ; no. 213.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 02957cam a2200553Ia 4500
001 2040370
003 SIRSI
005 20140620040318.0
007 ta
007 cr cn||||a||||
008 140619s2008 akuab s000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)881504476 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 213 
088 |a SuWa 213 
049 |a RLAA 
245 0 0 |a Susitna Hydro evaluation project :  |b seminar on the development of large hydroelectric projects with a focus on the Susitna Project /  |c HDR Alaska, Northern Economics, Inc., Devine Tarbell & Associates, Inc. 
246 1 |i The section on cost, economics, and financing has title:  |a Susitna Dam projects: cost, economics, and financing :  |b seminar on the development of large hydroelectric projects with a focus on the Susitna Project 
246 3 0 |a Seminar on the development of large hydroelectric projects with a focus on the Susitna Project 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2008?] 
300 |a [141] p. :  |b col. ill., col. maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 213 
500 |a "Presented to Alaska Energy Authority." 
500 |a "November 2008." 
500 |a Originally presented as a slide presentation. No commentary. 
500 |a ARLIS assigned report number: SuWa 213 (posted on the Alaska Energy Authority's "Railbelt large hydro reports" webpage; available as of June 19, 2014). 
530 |a Available also in electronic format on the Internet. 
505 0 |a Project history. (30 p.) -- Regulatory and environmental. (p. 47) -- Cost, economics, and financing. ([15] p.) -- Hydroelectric equipment, hydrology, and energy production. (23 p.) -- Susitna Project civil works considerations. (26 p.). 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Evaluation. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Evaluation. 
650 0 |a Hydroelectric power plants  |z Alaska  |x Evaluation. 
650 0 |a Dams  |z Alaska  |x Evaluation. 
650 0 |a Water-power  |z Alaska  |x Evaluation. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Evaluation. 
710 2 |a Northern Economics (Firm),  |e author. 
655 0 |a Business presentations. 
710 2 |a Devine Tarbell & Associates, Inc.,  |e author. 
710 2 |a HDR Alaska, Inc.,  |e author. 
710 2 |a Alaska Energy Authority. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 213. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa213/SuWa213-History.pdf  |3 Direct link to the first part (Project history).  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa213/index.html  |3 List of all parts of this document  |z ARLIS Document Server 
098 |a SuWa 00213 
596 |a 9 10