Revised study plan determination schedule.
A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana...
Saved in:
Alternate Title: | Reference: Revised study plan determination schedule |
---|---|
Main Author: | |
Additional Author(s): | Dyok, Wayne, |
Corporate Contributor(s): | United States. Federal Energy Regulatory Commission. Office of Energy Projects. Susitna-Watana Hydroelectric Project. Alaska Energy Authority. |
Report Numbers: | SuWa 88 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 88. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Letter
- attachment A. Revised study plan determination schedule for December 14, 2012, revised study plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.