Revised study plan determination schedule.

A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana...

Full description

Saved in:
Bibliographic Details
Alternate Title:Reference: Revised study plan determination schedule
Main Author: Wright, Jeff C.,
Additional Author(s):Dyok, Wayne,
Corporate Contributor(s):United States. Federal Energy Regulatory Commission. Office of Energy Projects.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Report Numbers:SuWa 88
Series:Susitna-Watana Hydroelectric Project document ; no. 88.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Letter
  • attachment A. Revised study plan determination schedule for December 14, 2012, revised study plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9.