Revised study plan determination schedule.

A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana...

Full description

Saved in:
Bibliographic Details
Alternate Title:Reference: Revised study plan determination schedule
Main Author: Wright, Jeff C.,
Additional Author(s):Dyok, Wayne,
Corporate Contributor(s):United States. Federal Energy Regulatory Commission. Office of Energy Projects.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority.
Report Numbers:SuWa 88
Series:Susitna-Watana Hydroelectric Project document ; no. 88.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03157ctm a2200589Ia 4500
001 2040135
003 SIRSI
005 20140619082406.0
007 ta
007 cr cn||||a||||
008 140618e20130117xx 000 i eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)881487508 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 88 
088 |a SuWa 88 
049 |a RLAA 
100 1 |a Wright, Jeff C.,  |e author. 
245 1 0 |a Revised study plan determination schedule. 
246 3 |a Reference: Revised study plan determination schedule 
260 |c 2013 January 17. 
300 |a 5 p. ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 88 
500 |a Title from caption. 
500 |a At head of title: "Reference:". 
500 |a "Project No. 14241-000 - Alaska, Susitna-Watana Hydroelectric Project, Alaska Energy Authority." 
500 |a "January 17, 2012." 
500 |a ARLIS assigned report number: SuWa 88. 
513 |a Correspondence. 
510 3 |a Listed in October 2013 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Correspondence. 
530 |a Available also in electronic format on the Internet. 
610 2 0 |a Alaska Energy Authority.  |t Revised study plan. 
520 |a A letter to Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, from Jeff C. Wright, Director, Office of Energy Projects, Federal Energy Regulatory Commission. This letter regards the Alaska Energy Authority's Revised study plan (filed December 14, 2012) for the Susitna-Watana Hydroelectric Project. This letter is in response to a letter from Alaska Energy Authority dated January 7, 2013 requesting the Commission staff withdraw the revised schedule that had been requested in a letter dated January 7, 2013. 
505 0 |a Letter -- attachment A. Revised study plan determination schedule for December 14, 2012, revised study plan studies 5.5, 5.6, 5.7, 6.5, 6.6, 7.5, 7.6, 8.5, 8.6, 9.5, 9.6, 9.8, and 9.9. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Planning. 
655 0 |a Government correspondence. 
700 1 |a Dyok, Wayne,  |e addressee. 
710 1 |a United States.  |b Federal Energy Regulatory Commission.  |b Office of Energy Projects. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority. 
787 0 |a Alaska Energy Authority.  |t Revised study plan.  |d [Anchorage : Alaska Energy Authority, 2012]  |w (OCoLC)864637672 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 88. 
787 0 8 |i Reply to:  |a Fisher-Goad, Sara.  |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000.  |d 2013 January 7  |k Susitna-Watana Hydroelectric Project document ; no. 87  |r SuWa 87  |w (OCoLC)860725219 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/0/SuWa88.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a SuWa 00088