Generation planning studies : close out report.

The objective of the generation planning studies was to plan the expansion and operation of the Alaska Railbelt electrical generation system with and without the Susitna Hydroelectric Project. These studies provide basic data for an economic analysis of the project, provide data for staging and sizi...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Generation planning studies : close out report

Title entered in the Susitna Hydroelectric Project document index as: Subtask 6.37, Close-out report, generation planning studies
Corporate Contributor(s):Acres American Incorporated.
Publisher:Acres American Incorporated,
Report Numbers:APA 1289
Series:Document (Susitna Hydroelectric Project) ; no. 1289.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:The objective of the generation planning studies was to plan the expansion and operation of the Alaska Railbelt electrical generation system with and without the Susitna Hydroelectric Project. These studies provide basic data for an economic analysis of the project, provide data for staging and sizing of the project, and supply the information to project financial studies.
Physical Description:[161] p. : ill., charts ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"April 1982."