Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material /
The objective of the Subtask 3.01 is to assemble and review all available reports, maps, and studies relating to the hydrologic aspects of the Susitna basin and neighboring basins and to abstract hydrologic design parameters required for the planning studies concerned with alternative hydroelectric...
Saved in:
Alternate Title: | Subtask 3.01, Closeout report. Review of available material Closeout report. Review of available material Review of available material Susitna Hydroelectric Project. Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 27 APA 329 APA 1220 |
Edition: | [Final]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 27. Document (Susitna Hydroelectric Project) ; no. 329. Document (Susitna Hydroelectric Project) ; no. 1220. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Summary
- Scope of work
- Hydrologic data for the Susitna basin
- Hydrologic data for alternative hydro sites
- Climatic data
- appendix A. Streamflow gaging stations in the Susitna basin
- appendix B. Memo on probable maximum precipitation estimates from national weather service to corps of engineers - undated
- appendix C. Suspended gaging stations
- appendix D. Water quality - stations and parameters
- appendix E. Miscellaneous correspondence and minutes of meetings with various agencies
- appendix F. Monthly streamflow data for alternative hydro sites
- appendix G. Climate data stations
- appendix H. Snow survey - stations and period of records
- appendix I. Data collected by Alaska Department of Fish and Game.