General investigation memorandum, Susitna Hydroelectric Project, aquatic program, fiscal year 1984.

This general investigation memorandum sets forth the objectives, methodology, organization, personnel, schedule, deliverables, and budget for accomplishing the fisheries and aquatic habitat studies needed to support the Federal Energy Regulatory Commission licensing of the Susitna Hydroelectric Proj...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project, aquatic program, fiscal year 1984

Aquatic program, fiscal year 1984
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.
Publisher:Harza-Ebasco Susitna Joint Venture,
Report Numbers:APA 3275
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 3275.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02380cam a2200493Ia 4500
001 2039424
003 SIRSI
005 20140604045503.0
007 ta
007 cr bn||||a||||
008 140604s1983 aku bt 000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)880945782 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 3275 
088 |a APA 3275 
049 |a RLAA 
245 0 0 |a General investigation memorandum, Susitna Hydroelectric Project, aquatic program, fiscal year 1984. 
246 3 0 |a Susitna Hydroelectric Project, aquatic program, fiscal year 1984 
246 3 0 |a Aquatic program, fiscal year 1984 
250 |a Final draft. 
260 |a [Alaska] :  |b Harza-Ebasco Susitna Joint Venture,  |c [1983] 
300 |a 64 p. in various pagings ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 3275 
500 |a "November 1983." 
500 |a Series statement from label on cover. 
510 3 |a Assigned APA Document no. 3275 in the Susitna Hydroelectric Project document index. 
530 |a Available also in electronic format on the Internet. 
520 |a This general investigation memorandum sets forth the objectives, methodology, organization, personnel, schedule, deliverables, and budget for accomplishing the fisheries and aquatic habitat studies needed to support the Federal Energy Regulatory Commission licensing of the Susitna Hydroelectric Project. The activities and budget described in this memorandum are for fiscal year 1984 (July 1983 through June 1984). 
504 |a Includes bibliographical references (p. 10-18 - 10-19). 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Fishes  |x Effect of dams on  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Freshwater habitats  |x Research  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project  |x Research. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3275. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/32/APA3275.pdf  |z ARLIS Document Server 
901 |a 3755  |c orig 
596 |a 9 10 
098 |a APA 03275