General investigation memorandum, Susitna Hydroelectric Project, terrestrial program, fiscal year 1984.

This general investigation memorandum sets forth the objectives, methodology, organization, personnel, schedule, deliverables, and budget for accomplishing the wildlife and botanical resources studies needed to support the Federal Energy Regulatory Commission licensing of the Susitna Hydroelectric P...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project, terrestrial program, fiscal year 1984

Terrestrial program, fiscal year 1984
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.
Publisher:Harza-Ebasco Susitna Joint Venture,
Report Numbers:APA 4137
Edition:Final draft.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02213cam a2200433Ia 4500
001 2039423
003 SIRSI
005 20160609103455.0
007 ta
007 cr bn||||a||||
008 140604s1983 aku bt 000 0 eng d
040 |a RLA  |b eng  |c RLA  |d RLA  |d OCLCO  |d OCLCQ  |d RLA 
035 |a (OCoLC)880945603 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 4137 
088 |a APA 4137 
049 |a RLAA 
245 0 0 |a General investigation memorandum, Susitna Hydroelectric Project, terrestrial program, fiscal year 1984. 
246 3 0 |a Susitna Hydroelectric Project, terrestrial program, fiscal year 1984 
246 3 0 |a Terrestrial program, fiscal year 1984 
250 |a Final draft. 
260 |a [Alaska] :  |b Harza-Ebasco Susitna Joint Venture,  |c [1983] 
300 |a 70 pages in various pagings ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a "November 1983." 
510 3 |a Alaska Resources Library and Information Services has assigned APA number 4137 to this document for the Susitna Hydroelectric Project collection. 
530 |a Available also in electronic format on the Internet. 
520 |a This general investigation memorandum sets forth the objectives, methodology, organization, personnel, schedule, deliverables, and budget for accomplishing the wildlife and botanical resources studies needed to support the Federal Energy Regulatory Commission licensing of the Susitna Hydroelectric Project. The activities and budget described in this memorandum are for fiscal year 1984 (July 1983 through June 1984). 
504 |a Includes bibliographical references (pages 10-13-10-17). 
650 0 |a Animals  |x Effect of dams on  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River Region. 
610 2 0 |a Susitna Hydroelectric Project  |x Research. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/41/APA4137.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a APA 04137