Unit prices - backup calculations, Watana Dam, breakdown of equipment costs.
A collection of hand completed worksheets (called 'Calculations') from Acres American Incorporated regarding estimated construction equipment costs for the Susitna Hydroelectric Project. These sheets cover cofferdams, rip-rap, excavation of overburden, reusable rock, and rock waste.
Saved in:
Alternate Title: | Book H. Unit prices - backup calculations, Watana Dam, breakdown of equipment costs. (H). Unit prices - backup calculations, Watana Dam, breakdown of equipment costs |
---|---|
Corporate Contributor(s): | Acres American Incorporated. HARZA-EBASCO Susitna Joint Venture. |
Publisher: | Acres American Incorporated, |
Report Numbers: | APA 106 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 106. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02587nam a2200481Ia 4500 | ||
---|---|---|---|
001 | 2038584 | ||
003 | SIRSI | ||
005 | 20140523011043.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 140522s1982 nyu t 000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)880379938 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 106 | |
088 | |a APA 106 | ||
049 | |a RLAA | ||
130 | 0 | |a Book H. |p Unit prices - backup calculations, Watana Dam, breakdown of equipment costs. | |
245 | 1 | 0 | |a Unit prices - backup calculations, Watana Dam, breakdown of equipment costs. |
246 | 3 | |a (H). |p Unit prices - backup calculations, Watana Dam, breakdown of equipment costs | |
260 | |a [Buffalo, N.Y.? : |b Acres American Incorporated, |c 1982] | ||
300 | |a 16 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 106 | |
500 | |a At head of title: (H). | ||
500 | |a Series statement from label on title page. | ||
500 | |a This document belongs to a set of volumes issued by Acres American Incorporated (as indicated in the Susitna Hydroelectric Project document index) that are also called 'Books', such as Book A, Book B, etc. | ||
500 | |a Cataloging based on copy with no page numbered 1 (perhaps the title page) or 2. | ||
510 | 3 | |a Assigned APA Document no. 106 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a A collection of hand completed worksheets (called 'Calculations') from Acres American Incorporated regarding estimated construction equipment costs for the Susitna Hydroelectric Project. These sheets cover cofferdams, rip-rap, excavation of overburden, reusable rock, and rock waste. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 0 | |a Dams |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Design and construction |x Estimates |z Alaska |z Susitna River. | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 106. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/1/APA106.pdf |z ARLIS Document Server |
901 | |a 3755 |c orig |h PDF file: Pages were cropped, but edges have not yet been removed because the filesize increases when trying to save with permanent trimming. Waiting for Adobe fix that can reduce file size. | ||
596 | |a 9 10 | ||
098 | |a APA 00106 |